Message ID: 281     Entry time: Wednesday, March 27, 2013, 12:08
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Sic LIS-RFQ 
Subject: TM4 heat shield circuit leak check with SiC LIS-RFQ target 

Chad and I did the TM4 heat shield leak check yesterday at SHC. The leak detector was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4 torr after 1.5 hours pumping. Chad sprayed helium twice on both VCR fittings. There is no response had been found during each 45 seconds waiting time. Since the module moved to ITE directly,we didnt have helium pressure test this time. I  would say thee heat shield circuit is leak tight. so far.