  260   Wednesday, March 13, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Module Move TM4 with CS Test Target #1 was moved
from the SHC to the Conditioning Station.
All went well. The welding cables came a
  
  262   Thursday, March 14, 2013, 07:09 David WangSouth Hot-CellStandard OperationTM4 TM4 electrical test at SHC after windown and containment box back.TM4 electrical test at SHC after windown
and containment box back is done. Everything
is fine. 
  
  263   Thursday, March 14, 2013, 07:18 David WangSouth Hot-CellStandard OperationTM4 TM4 window cooling line leak checkIt took a long time(more than 1 hour)  
to pump down the TM4 window  cooling
line during leak check time. The base leak
  
  264   Thursday, March 14, 2013, 10:04 Bevan MossConditioning StationStandard OperationTM4CS Test Target 1Cooling Package Started The cooling package was started at
10:00 today. See attached picture. There
is another snap shot at 10:03.
 Cooling_system_start.JPGCooling_System_start_3_min.JPG 
  265   Thursday, March 14, 2013, 11:25 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Turbos Started Turbos started at 11:14. TP1S achieved
full speed in less than 2 minutes. TP1 and
2 tripped at 9 minutes. Restarted and reached
 turbo_started_1115.JPGvacuum_running_1124.JPG 
  266   Thursday, March 14, 2013, 11:56 Bevan MossConditioning StationStandard OperationTM4CS Test Target 1Cooling Package Started

    

       
            
 Cooling_package_1155.JPG 
  269   Monday, March 18, 2013, 15:28 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Vented With Argon The conditioning station has been
vented with argon. Time taken is not known
but it is less than 3 hours. See attached
 Vented_with_Argon.JPG 
  270   Tuesday, March 19, 2013, 09:55 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Turbo pump 1 replaced roughing started David replaced the broken turbo pump
this morning and I have started roughing
at 9:54.
  
  271   Tuesday, March 19, 2013, 13:49 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Tubros Started Turbo Pumps have been started and
are in normal operation. TP1 which has recently
been replaced was started in soft start and
  
  275   Monday, March 25, 2013, 09:35 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Cooling Package and Vacuum Stopped The cooling package and vacuum was
stopped today at 9:26 so the module can be
move.
  
  277   Monday, March 25, 2013, 14:19 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well.
  
  278   Tuesday, March 26, 2013, 14:17 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)Electrical checkElectrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but
 TM4_SiC28_RFQ_SHC_ELEC_CHK.PDF 
  279   Wednesday, March 27, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well.
  
  280   Wednesday, March 27, 2013, 11:49 David WangITEStandard OperationTM4Sic LIS-RFQ Connected TM4 in ITETM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after 
  
  281   Wednesday, March 27, 2013, 12:08 David WangSouth Hot-CellStandard OperationTM4Sic LIS-RFQTM4 heat shield circuit leak check with SiC LIS-RFQ targetChad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4
  
  282   Tuesday, April 02, 2013, 10:07 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 inserted into hot cellTa#39 has been inserted into the hot cell
in preparation for TM1 target change.
  
  283   Wednesday, April 03, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south west
silo to the south hot cell, move went well.
  
  285   Wednesday, April 03, 2013, 13:28 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 installedTa#39 has been installed onto TM1.   
  286   Wednesday, April 03, 2013, 14:39 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39Electrical checkElectrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details.
 TM1_Ta39_SHC_ELEC_CHK.PDF 
  287   Thursday, April 04, 2013, 11:06 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39module moveTM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well.
  