260
|
Wednesday, March 13, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Module Move | TM4 with CS Test Target #1 was moved
from the SHC to the Conditioning Station.
All went well. The welding cables came a |
|
262
|
Thursday, March 14, 2013, 07:09 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 electrical test at SHC after windown and containment box back. | TM4 electrical test at SHC after windown
and containment box back is done. Everything
is fine. |
|
263
|
Thursday, March 14, 2013, 07:18 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 window cooling line leak check | It took a long time(more than 1 hour)
to pump down the TM4 window cooling
line during leak check time. The base leak |
|
264
|
Thursday, March 14, 2013, 10:04 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started | The cooling package was started at
10:00 today. See attached picture. There
is another snap shot at 10:03. |
|
265
|
Thursday, March 14, 2013, 11:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbos Started | Turbos started at 11:14. TP1S achieved
full speed in less than 2 minutes. TP1 and
2 tripped at 9 minutes. Restarted and reached |
|
266
|
Thursday, March 14, 2013, 11:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started |
|
|
269
|
Monday, March 18, 2013, 15:28 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Vented With Argon | The conditioning station has been
vented with argon. Time taken is not known
but it is less than 3 hours. See attached |
|
270
|
Tuesday, March 19, 2013, 09:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbo pump 1 replaced roughing started | David replaced the broken turbo pump
this morning and I have started roughing
at 9:54. |
|
271
|
Tuesday, March 19, 2013, 13:49 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Tubros Started | Turbo Pumps have been started and
are in normal operation. TP1 which has recently
been replaced was started in soft start and |
|
275
|
Monday, March 25, 2013, 09:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Cooling Package and Vacuum Stopped | The cooling package and vacuum was
stopped today at 9:26 so the module can be
move. |
|
277
|
Monday, March 25, 2013, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well. |
|
278
|
Tuesday, March 26, 2013, 14:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | Electrical check | Electrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but |
|
279
|
Wednesday, March 27, 2013, 10:44 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well. |
|
280
|
Wednesday, March 27, 2013, 11:49 |
David Wang | ITE | Standard Operation | TM4 | Sic LIS-RFQ | Connected TM4 in ITE | TM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after |
|
281
|
Wednesday, March 27, 2013, 12:08 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Sic LIS-RFQ | TM4 heat shield circuit leak check with SiC LIS-RFQ target | Chad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4 |
|
282
|
Tuesday, April 02, 2013, 10:07 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 inserted into hot cell | Ta#39 has been inserted into the hot cell
in preparation for TM1 target change. |
|
283
|
Wednesday, April 03, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south west
silo to the south hot cell, move went well. |
|
285
|
Wednesday, April 03, 2013, 13:28 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 installed | Ta#39 has been installed onto TM1. |
|
286
|
Wednesday, April 03, 2013, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Electrical check | Electrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details. |
|
287
|
Thursday, April 04, 2013, 11:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | module move | TM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well. |
|