Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 286     Entry time: Wednesday, April 03, 2013, 14:39
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta#39 
Subject: Electrical check 

Electrical check on TM#1 with Ta#39 installed at the south hot cell. Target passed the electrical checks, see attached pdf for details.

Attachment 1: TM1_Ta39_SHC_ELEC_CHK.PDF  202 kB  | Show | Hide all
ELOG V2.9.2-2455