Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 260     Entry time: Wednesday, March 13, 2013, 14:31
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: CS Test Target #1 
Subject: Module Move 

 TM4 with CS Test Target #1 was moved from the SHC to the Conditioning Station. All went well. The welding cables came a little close to the cage, David will bend them in more in the future.

ELOG V2.9.2-2455