Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
262
Entry time:
Thursday, March 14, 2013, 07:09
Author:
David Wang
Category:
South Hot-Cell
Type:
Standard Operation
Module:
TM4
Target/Number:
Subject:
TM4 electrical test at SHC after windown and containment box back.
TM4 electrical test at SHC after windown and containment box back is done. Everything is fine.
ELOG V2.9.2-2455