Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 262     Entry time: Thursday, March 14, 2013, 07:09
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: TM4 electrical test at SHC after windown and containment box back. 

TM4 electrical test at SHC after windown and containment box back is done. Everything is fine.

ELOG V2.9.2-2455