260
|
Wednesday, March 13, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Module Move | TM4 with CS Test Target #1 was moved
from the SHC to the Conditioning Station.
All went well. The welding cables came a |
|
|
261
|
Wednesday, March 13, 2013, 15:26 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | Roughing Started | Roughing pumps were turned on at
15:23 13/03/2013. |
|
|
264
|
Thursday, March 14, 2013, 10:04 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started | The cooling package was started at
10:00 today. See attached picture. There
is another snap shot at 10:03. |
|
|
265
|
Thursday, March 14, 2013, 11:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbos Started | Turbos started at 11:14. TP1S achieved
full speed in less than 2 minutes. TP1 and
2 tripped at 9 minutes. Restarted and reached |
|
|
266
|
Thursday, March 14, 2013, 11:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started |
|
|
|
267
|
Monday, March 18, 2013, 12:03 |
Bevan Moss | Conditioning Station | Repair | TM4 | CS Test Target #1 | Turbo Pump 1 Failure and Venting | Over the weekend Turbo pump one failed.
It was attempted to restart the turbo in
soft start but that also failed. Although |
|
|
268
|
Monday, March 18, 2013, 12:39 |
Bevan Moss | Conditioning Station | Repair | TM4 | CS Test Target #1 | TGHT PS Failure | The Model of the Power
Supply (PS) is TSQLG 480-20/1500 and serial
number is 2755.02.01.01.09. |
|
|
269
|
Monday, March 18, 2013, 15:28 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Vented With Argon | The conditioning station has been
vented with argon. Time taken is not known
but it is less than 3 hours. See attached |
|
|
270
|
Tuesday, March 19, 2013, 09:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbo pump 1 replaced roughing started | David replaced the broken turbo pump
this morning and I have started roughing
at 9:54. |
|
|
271
|
Tuesday, March 19, 2013, 13:49 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Tubros Started | Turbo Pumps have been started and
are in normal operation. TP1 which has recently
been replaced was started in soft start and |
|
|
275
|
Monday, March 25, 2013, 09:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Cooling Package and Vacuum Stopped | The cooling package and vacuum was
stopped today at 9:26 so the module can be
move. |
|
|
276
|
Monday, March 25, 2013, 10:59 |
Bevan Moss | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 2 Completed |
|
|
|
288
|
Thursday, April 04, 2013, 12:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started | Roughing started at 12:06. It was
believed there was a problem with the compressed
air but there was none, TM1 doesn't leak |
|
|
289
|
Thursday, April 04, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started |
|
|
|
292
|
Monday, April 08, 2013, 16:16 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Venting with Argon | TM1 started venting at 4:15 pm with
Argon. I will leave the valve open over night. |
|
|
304
|
Wednesday, April 17, 2013, 15:17 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Turbo Pumps Failed | Both Turbo pumps on TM3 have failed.
They were both attempted to start in soft
mode. TP2 could only achieve ~19kpm and TP1 |
|
|
305
|
Friday, April 19, 2013, 10:48 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Turbo Pump 2 replaced | Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit. |
|
|
306
|
Friday, April 19, 2013, 10:48 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Turbo Pump 2 replaced | Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit. |
|
|
307
|
Friday, April 19, 2013, 10:51 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Roughing Started 10:48 | With the Turbo pump replaced I have started
roughing at 10:48 |
|
|
308
|
Friday, April 19, 2013, 13:32 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Turbo Pumps Started | Both Turbo Pumps are now operational. |
|