Thursday, April 04, 2013, 12:07, Bevan Moss, Conditioning Station, Standard Operation, TM1, Ta #39, Roughing started
|
Thursday, April 04, 2013, 14:31, Bevan Moss, Conditioning Station, Standard Operation, TM1, Ta #39, Roughing started
|
|
Message ID: 289
Entry time: Thursday, April 04, 2013, 14:31
In reply to: 288
|
Author: |
Bevan Moss |
Category: |
Conditioning Station |
Type: |
Standard Operation |
Module: |
TM1 |
Target/Number: |
Ta #39 |
Subject: |
Roughing started |
|
|
Bevan Moss wrote: |
Roughing started at 12:06. It was believed there was a problem with the compressed air but there was none, TM1 doesn't leak and so you cannot hear that the connection is made.
|
Roughing stopped as the module and cover requires modifications that require the vacuum to be opened. |