Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
307
Entry time:
Friday, April 19, 2013, 10:51
Author:
Bevan Moss
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM3
Target/Number:
N/A
Subject:
Roughing Started 10:48
With the Turbo pump replaced I have started roughing at 10:48
ELOG V2.9.2-2455