Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
306
Entry time:
Friday, April 19, 2013, 10:48
Author:
Bevan Moss
Category:
Conditioning Station
Type:
Maintenance
Module:
TM3
Target/Number:
N/A
Subject:
Turbo Pump 2 replaced
Turbo Pump 2 has been replaced on TM3. I got a count of 350 on the sleeve of my tank suit.
ELOG V2.9.2-2455