ID Date Author Category Typedown Subject Text Attachments
  77   Tuesday, April 07, 2015, 08:27 Keith C NgM9Developmentm9 t2 alignment jobWork completed for Thursday:
1) Shielding filler blocks removed
from M9Q1Q2 hole. Highest field was 5mSv/h
 20150407_m9t2_P1030233.JPG 
  78   Tuesday, April 07, 2015, 16:09 Keith C NgM9Developmentm9 t2 alignment jobwork to prepare for installation of alignment
jigs on T2M9 and M9B1 continues:
1) Vented T2 volume and removed M9
  
  79   Wednesday, April 08, 2015, 14:18 Keith C NgM9Developmentm9 t2 alignment job1) Visual inspection of T2 M9 flange: no
obvious indium deposits on T2 flange knife
edge seen, left over indium from before 2013
 12x 
  80   Thursday, April 09, 2015, 17:20 Keith C NgM9Developmentm9 t2 alignment job1) Vented T2 and removed rubber seal blanking
plate, vacuum level appeared to be at normal
operating ranges prior to the indium seal
 20150409_m9t2_P1030246.JPG20150409_m9t2_P1030251.JPG20150409_m9t2_P1030256.JPG20150409_m9t2_P1030248.JPG 
  81   Friday, April 10, 2015, 16:25 Keith C NgM9Developmentm9 t2 alignment jobContinued with installation of target jigs:
1) Craned in equipment for alignment
group.
  
  82   Tuesday, April 14, 2015, 08:31 Keith C NgM9Developmentm9 t2 alignment jobYesterday:
1) Addressed mounting issue with
the 15" alignment jig: removed material
 20150414_m9t2_P1030289.JPG20150414_m9t2_P1030290.JPG20150414_m9t2_P1030295.JPG20150414_m9t2_P1030297.JPG 
  83   Thursday, April 16, 2015, 09:17 Keith C NgM9Developmentm9 t2 alignment jobYesterday (Apr 15):
1) Installed TB22265 on to M9 exit
port at 18:48 with no vacuum and left over
 9x 
  84   Friday, April 17, 2015, 15:11 Keith C NgM9Developmentm9 t2 alignment jobToday: Restored filler shielding in T2
M9 Q1Q2 hole.
- Blocks marked with beam direction
 6x 
  87   Thursday, February 18, 2016, 16:34 Keith C NgPrimary BeamlinesDevelopmentVault beam line 4V disassemblyDisconnected all 4V beamline joints. Parts
for indium joints removed except for the
Q1 to downstream monitor box and monitor
  
  88   Friday, February 19, 2016, 14:03 Keith C NgPrimary BeamlinesDevelopment4V CM1 blankingContinued with work blanking off CM1 flange.
- Placed lead shot on left and right
side of the CM1 flange to lower fields. No
 20160219_beamline4v_P1030499.JPG 
  89   Monday, February 22, 2016, 16:09 Keith C NgPrimary BeamlinesDevelopment4V CM1 blanking 
Rolled
indium into new blanking plate turned down
 20160222_beamline4v_P1030502.JPG20160222_beamline4v_P1030511.JPG20160222_beamline4v_P1030505.JPG20160223_4VCM1_blank_off_inspection_report.pdf 
  90   Friday, March 04, 2016, 16:05 Keith C NgPrimary BeamlinesDevelopmentvault beamline 4 disassembly 
Attempted
to remove RH parts between Q1, 2 and monitor
  
  91   Wednesday, March 16, 2016, 17:19 Ron KuramotoPrimary BeamlinesDevelopment4VQ3 Removal On 8March2016, under W/P C2016-03-08-2,
4VQ3 was lifted out of BL4V with the vault
orbit crane where it was first weighed then
 IMG_1893.JPGIMG_1893.JPGIMG_1899.JPGIMG_1902.JPGIMG_1907.JPG 
  92   Wednesday, March 16, 2016, 17:57 Ron KuramotoPrimary BeamlinesDevelopment4VQ1&Q2 Removal On 14March2016, 4VQ1&Q2 were
removed from BL4V and lowered into the Vault
basement B3 level where they were stored
 13x 
  93   Thursday, March 31, 2016, 15:32 Keith C NgPrimary BeamlinesDevelopment1VM3 to 1VQ4 joint.Re-installed indium vacuum joint for 1VQ4,
routing installation. R. Kuramoto sprayed
silicone grease on to the threads and bushings
  
  94   Monday, January 30, 2017, 12:01 Keith C NgM9DevelopmentT2 leak check with vac groupWeek
of Jan 23 to 27:
 
  
  95   Wednesday, February 01, 2017, 15:34 Keith C NgM9DevelopmentT2 M9 SetupFinished setting up work area around T2
M9 front end.
 
 t2m920170201_143714_1032.jpg 
  96   Friday, February 03, 2017, 14:57 Keith C NgM9DevelopmentRemoving shield blocks and leak check results.Removed temporary shielding blocks from
M9 hole and placed in temporary bunker. Capped
with 18' shielding block. Blank off ready
 t2m920170203_140114_0604.jpgt2m920170203_120314_0686.jpgLocal_leak_check_Jan_27_2017.pdf 
  97   Tuesday, February 07, 2017, 15:36 Keith C NgM9Developmentt2 m9 job - Removed blank off from t2 m9 port,
had to pry off with screw driver via spring
ears. Clean removal it seems.
 20170207_rh_shutdown_log.pdf 
  98   Thursday, February 09, 2017, 16:14 Keith C NgM9Developmentt2 m9 alignmentPrepared m9 and b1 flanges for accepting
their target jigs. The target jigs need to
be reset by alignment group, 15" was
 20170209_t2m9alignment_P1030588.JPG20170209_t2m9alignment_P1030586.JPG 