Message ID: 87     Entry time: Thursday, February 18, 2016, 16:34
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: Vault beam line 4V disassembly 

Disconnected all 4V beamline joints. Parts for indium joints removed except for the Q1 to downstream monitor box and monitor upstream to Q2 due to access issues (no space for ingress). Removed pin drive and collars currently piled on top of the beam line stands near the concrete shielding block on the north side of the vault. These need to be sorted for storage as waste or spares. Indium ring carriers were all bagged and left in the area waiting for a storage location.