Message ID: 93     Entry time: Thursday, March 31, 2016, 15:32
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: 1VM3 to 1VQ4 joint. 

Re-installed indium vacuum joint for 1VQ4, routing installation. R. Kuramoto sprayed silicone grease on to the threads and bushings on pin drive. Drove down tapererd pins and stopped 1/16" short of old marker markings.  RK. Commented on the drive screw bending under load, reversed drive 1/2 turn to relieve the stress on the screw.

Contacted E. Dalla Valle to continue assembling beam line down stream and pump when ready.