Today: Restored filler shielding in T2 M9 Q1Q2 hole.
- Blocks marked with beam direction on this installation. Active faces point toward target monument.
  
- Checked spring eye spacing after installation under vacuum overnight, appears to be equal on both sides. 1/16" spacing.
  
- Remote handling equipment has been removed from work area and restoration of shelding around T2 has begun as of 15:00. |