Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 96     Entry time: Friday, February 03, 2017, 14:57
Author: Keith C Ng 
Category: M9 
Type: Development 
Subject: Removing shield blocks and leak check results. 

Removed temporary shielding blocks from M9 hole and placed in temporary bunker. Capped with 18' shielding block. Blank off ready to be removed and target jigs ready to be installed, weather permitting.

Raw leak check results from vacuum group attached as pdf.

 

Attachment 1: t2m920170203_140114_0604.jpg  97 kB  | Show | Hide all
Attachment 2: t2m920170203_120314_0686.jpg  91 kB  | Show | Hide all
Attachment 3: Local_leak_check_Jan_27_2017.pdf  46 kB  | Show | Hide all
ELOG V2.9.2-2455