75
|
Wednesday, December 11, 2024, 11:45 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Service Tray and Associated Component Testing | Dec 10, 2024
Testing completed: |
16x |
|
78
|
Wednesday, January 15, 2025, 12:57 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Service Tray Flexible VCR Line Exchange Testing | Removal and replacement testing of the
stainless VCR lines extending from the HVFT
to the piston modules and FE plate is documented |
  |
|
81
|
Wednesday, January 15, 2025, 13:23 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Power Busbars Stabuli Connector Exchange | We successfully performed a removal and
replacement of a power busbar stabuli connector
on the front end plate where the HTV connects |
|
|
71
|
Tuesday, November 19, 2024, 15:38 |
Albert Kong | Hot Cell 1 | Standard Operation | APTW Front End Moved into Hot Cell | The APTW front end was moved into the hot
cell, on the lift table, following procedures
outlined in Document-244862. |
23x |
|
83
|
Thursday, February 13, 2025, 18:00 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Mid-Height and Upper VCR Joint Access and Service Testing | Feb 13:
The 'hanging' VCR joint on the driver
side was successfully exchanged by hand: |
|
|
84
|
Thursday, February 20, 2025, 14:44 |
Albert Kong | Hot Cell 1 | Development | APTW Front End KF Gasket Clamps Servicing Tests (By Gate Valve) | Covers testing for dealing with KF joints
by the gate valve on the FE.
Photos provided in PDF, download |
|
|
86
|
Thursday, March 20, 2025, 16:54 |
Albert Kong | Hot Cell 1 | Development | APTW Front End High Voltage Shielding Exchange Testing | Photos compiled in pdf, download to view
in case ELOG preview truncates.
------------------ |
 |
|
79
|
Wednesday, January 15, 2025, 12:57 |
Albert Kong | Hot Cell 1 | Development | APTW Front End HTV Water Connector Exchange Testing | The four water connections on the front
end plate of the APTW that will connect to
the HTV were tested for replacement with |
    |
|
89
|
Wednesday, April 23, 2025, 13:40 |
Aaron Tam | Hot Cell 1 | Development | APTW Front End Gate Valve Assembly Installation | Previously |
29x |
|
72
|
Wednesday, November 27, 2024, 18:38 |
Albert Kong | Hot Cell 1 | Standard Operation | APTW Front End Electrical Cable Replacement Testing | November 27, 2024
Testing completed:
Removal and re-insertion |
19x |
|
42
|
Tuesday, November 19, 2019, 10:31 |
Adam Newsome | T-Hall Crane | Repair | 900VFD Encoder Board Replacement | An issue arose in which the ARIEL crane hoist
could not be moved. It was determined that
the East and West drums were out of synchronization |
    |
|
74
|
Friday, November 29, 2024, 15:23 |
Adam Newsome | Hot Cell 1 | Maintenance | 1000 kg crane: y axis position display not functioning | After a recent power cycle, the y-axis
referencing was lost for the 1000 kg crane.
The position readout was also incorrect, |
|