Feb 13:

The 'hanging' VCR joint on the driver side was successfully exchanged by hand:

  • The adjacent HV shielding had to be removed to do so
  • Access to the screws on the shielding is limited so likely the use of a manual ratchet and socket key is required

All other 'mid-height' VCR joints ok for gasket exchange since they are accessible

The driver side upper VCR line was tested:

  • Issue with bracket for male side on shield plug, the adapter does not thread in fully
  • Flexible hose could be positioned into bracket with manipulators
  • Upper VCR lines will be revisited when correction to bracket is made and when the interfering tube on the HTV side is solved.

 