ID |
Date |
Author |
Category |
Type |
Subject |
Text |
|
|
40
|
Wednesday, March 13, 2019, 16:14 |
Isaac Earle | 100KW Beam Dump | Development | Testing EHD water leak detectors | The following work was completed today
on the EHD water leak sensors:
Mike Vogel installed a |
9x |
|
27
|
Monday, January 25, 2016, 13:20 |
Allon Messenberg | T-Hall Crane | Maintenance | Possible oil leak | Two small (approx. 5 cm across) puddles
of green fluid were discovered on the floor,
directly below the crane trolley. The |
|
|
70
|
Thursday, October 17, 2024, 11:34 |
Albert Kong | Hot Cell 1 | Development | Tarping completed on hot cell roof | Two tarps were installed above the hot
cell roof to protect against concrete dust
while testing in the hot cell. |
|
|
71
|
Tuesday, November 19, 2024, 15:38 |
Albert Kong | Hot Cell 1 | Standard Operation | APTW Front End Moved into Hot Cell | The APTW front end was moved into the hot
cell, on the lift table, following procedures
outlined in Document-244862. |
23x |
|
72
|
Wednesday, November 27, 2024, 18:38 |
Albert Kong | Hot Cell 1 | Standard Operation | APTW Front End Electrical Cable Replacement Testing | November 27, 2024
Testing completed:
Removal and re-insertion |
19x |
|
75
|
Wednesday, December 11, 2024, 11:45 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Service Tray and Associated Component Testing | Dec 10, 2024
Testing completed: |
16x |
|
78
|
Wednesday, January 15, 2025, 12:57 |
Albert Kong | Hot Cell 1 | Development | APTW Front End HTV Water Connector Exchange Testing | The four water connections on the front
end plate of the APTW that will connect to
the HTV were tested for replacement with |
|
|
79
|
Wednesday, January 15, 2025, 12:57 |
Albert Kong | Hot Cell 1 | Development | APTW Front End HTV Water Connector Exchange Testing | The four water connections on the front
end plate of the APTW that will connect to
the HTV were tested for replacement with |
|
|
80
|
Wednesday, January 15, 2025, 13:09 |
Albert Kong | Hot Cell 1 | Repair | West turntable festooning pillar and cable damage | Some issues were encountered with the turntable
controls on the west hot cell, as a result
the festooning post for the turntable was |
|
|
81
|
Wednesday, January 15, 2025, 13:23 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Power Busbars Stabuli Connector Exchange | We successfully performed a removal and
replacement of a power busbar stabuli connector
on the front end plate where the HTV connects |
|
|
82
|
Wednesday, January 15, 2025, 13:52 |
Albert Kong | Hot Cell 1 | Development | APTW Front End VCR Gasket Selection | Today RH (CF and AK) agreed upon using
the following style of gaskets for the ARIEL
front ends: |
|
|
42
|
Tuesday, November 19, 2019, 10:31 |
Adam Newsome | T-Hall Crane | Repair | 900VFD Encoder Board Replacement | An issue arose in which the ARIEL crane hoist
could not be moved. It was determined that
the East and West drums were out of synchronization |
|
|
43
|
Thursday, February 13, 2020, 08:51 |
Adam Newsome | T-Hall Crane | Standard Operation | Remote mode door limit switch bypass | The non-existent safety limit switch for
the target hall door which prevents remote
motion has been bypassed in the crane PLC |
|
|
44
|
Friday, July 03, 2020, 15:43 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist: West Travel Motion Failure | An issue was observed in which the North
Aux hoist failed to travel West when commanded
to, but the East motion was functioning. |
|
|
45
|
Wednesday, September 09, 2020, 10:51 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist Replacement (followup on E-Log 44) | See E-Log 44 for details on North Aux Hoist
failure.
A replacement VFD was ordered by |
|
|
46
|
Wednesday, September 15, 2021, 15:10 |
Adam Newsome | T-Hall Crane | Maintenance | Hoist Broken Fault (actually: cable wrap issue) | A fault occurred which presented as "114.
Main Hoist Cable Broken (3200PX)". This
occurred when a SEG block was suspended approximately |
|
|
47
|
Thursday, September 16, 2021, 09:37 |
Adam Newsome | T-Hall Crane | Maintenance | Bridge Encoder Homing | The bridge motion was slowed due to encoder
homing issue. It is likely that the problem
which occurred yesterday caused an velocity |
|
|
48
|
Tuesday, November 23, 2021, 11:01 |
Adam Newsome | T-Hall Crane | Repair | Load Cell - Not Functioning | The load cell which is located on the crane
itself to display the load to operators was
reported not working during the week of November |
|
|
49
|
Thursday, January 06, 2022, 10:46 |
Adam Newsome | T-Hall Crane | Development | Modification of South Limits | Edit: as of May 30, 2022, the modification
has been reversed, and the crane is functioning
normally as per the manufacturer's limits. |
|
|
50
|
Tuesday, February 01, 2022, 08:29 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist - West Motion Failure | An issue was observed in which the North
Aux hoist failed to travel West when commanded
to, but the East motion was functioning. |
|