ID Date Author Categorydown Type Subject Text Attachments
  73   Thursday, November 28, 2024, 09:04 Adam NewsomeHot Cell 1RepairHot Cell turntables not rotating, access hatch not movingIt was reported that the hot cell turntables
would not rotate and the access hatch could
not be operated. The turntables' elevation
  
  74   Friday, November 29, 2024, 15:23 Adam NewsomeHot Cell 1Maintenance1000 kg crane: y axis position display not functioningAfter a recent power cycle, the y-axis
referencing was lost for the 1000 kg crane.
The position readout was also incorrect,
 PXL_20241202_204356508.jpg 
  75   Wednesday, December 11, 2024, 11:45 Albert KongHot Cell 1DevelopmentAPTW Front End Service Tray and Associated Component TestingDec 10, 2024

Testing completed:
 16x 
  76   Thursday, December 12, 2024, 15:57 Aaron TamHot Cell 1DevelopmentAPTW Pistons Gas lines exchange testingDecember 12, 2024 - Chad Fisher,
Albert Kong, Aaron Tam 
Tests:
 13x 
  77   Thursday, December 12, 2024, 16:20 Aaron TamHot Cell 1DevelopmentExtraction Electrode Banana Plug (Show and Tell) December 12, 2024 - Chad
Fisher, Albert Kong, Aaron Tam, Austin Hagen
Tests:
 6x 
  78   Wednesday, January 15, 2025, 12:57 Albert KongHot Cell 1DevelopmentAPTW Front End Service Tray Flexible VCR Line Exchange TestingRemoval and replacement testing of the
stainless VCR lines extending from the HVFT
to the piston modules and FE plate is documented
 Feb13_ServiceTrayToFEPlateLinesExchangeTesting.pdfFeb_20_FE_Plate_Gas_Lines.pdfMar_06_Gas_Line_Exchange.pdf 
  79   Wednesday, January 15, 2025, 12:57 Albert KongHot Cell 1DevelopmentAPTW Front End HTV Water Connector Exchange TestingThe four water connections on the front
end plate of the APTW that will connect to
the HTV were tested for replacement with
 Screenshot_2025-01-15_121632.pngJan15_FE_Plate_Water_Lines.pdfJan23_FE_Plate_Water_Lines.pdfJan29_FE_Plate_Water_Lines.pdfFeb06_FinalHTVFEPlateWaterLineExchangeTesting.pdf 
  80   Wednesday, January 15, 2025, 13:09 Albert KongHot Cell 1RepairWest turntable festooning pillar and cable damageSome issues were encountered with the turntable
controls on the west hot cell, as a result
the festooning post for the turntable was
 IMG_0973.JPEG 
  81   Wednesday, January 15, 2025, 13:23 Albert KongHot Cell 1DevelopmentAPTW Front End Power Busbars Stabuli Connector ExchangeWe successfully performed a removal and
replacement of a power busbar stabuli connector
on the front end plate where the HTV connects
 Jan_15_Stabuli.pdf 
  82   Wednesday, January 15, 2025, 13:52 Albert KongHot Cell 1DevelopmentAPTW Front End VCR Gasket SelectionToday RH (CF and AK) agreed upon using
the following style of gaskets for the ARIEL
front ends:
 IMG_0960.JPEG 
  83   Thursday, February 13, 2025, 18:00 Albert KongHot Cell 1DevelopmentAPTW Front End Mid-Height and Upper VCR Joint Access and Service TestingFeb 13:
The 'hanging' VCR joint on the driver
side was successfully exchanged by hand:
 Feb13_UpperVCRTesting.pdf 
  84   Thursday, February 20, 2025, 14:44 Albert KongHot Cell 1DevelopmentAPTW Front End KF Gasket Clamps Servicing Tests (By Gate Valve)Covers testing for dealing with KF joints
by the gate valve on the FE.
Photos provided in PDF, download
 Feb_20_FE_KF_Joint_Clamps.pdf 
  85   Monday, March 10, 2025, 11:35 Jason ZhangHot Cell 1DevelopmentARIEL Hot Cell PLC Update - 1000kg Crane Travel ZoneWednesday, March 05, 2025, 13:00
Implemented and tested travel zone
restrictions for the 1000kg crane to prevent
  
  86   Thursday, March 20, 2025, 16:54 Albert KongHot Cell 1DevelopmentAPTW Front End High Voltage Shielding Exchange TestingPhotos compiled in pdf, download to view
in case ELOG preview truncates.
------------------
 HV_Shield_Testing_Mar_20.pdfApril_16.pdf 
  87   Wednesday, April 09, 2025, 15:31 Adam NewsomeHot Cell 1DevelopmentTwo jib cranes installedTwo externally mounted jib cranes were
installed on the ARIEL hot cell - one on
the West side above the tool port, and one
 ACDC_CRANES_3500_Job_10098_General_Quote24_2.pdfPXL_20250409_175712902.MP.jpgPXL_20250409_175730905.MP.jpg 
  88   Tuesday, April 15, 2025, 10:35 Riley SykesHot Cell 1RepairNorth Roxtec Hinge and door. Repairs were done on the North door
that would not close. Due to the weight on
the hinge pintle and gudgeon repairs were
 Image_(7).jfif 
  33   Tuesday, May 02, 2017, 16:52 Isaac EarleBL4NDevelopmentBL4N 35-deg bender stand hardened parts tested Hardness testing was performed on
1 sample each of parts TBP1822 and TBP1823
(part of the 35-deg magnet stand assembly
  
  35   Thursday, June 01, 2017, 15:25 Isaac EarleBL4NDevelopmentBL4N 35-deg bender adjustment blocks modified to fit magnetAdjustment blocks were installed on the
second dipole bender today (labeled "No.
03" "C15-III-57/15").  The
 Stress_analysis_on_TBP1808_and_1809_for_modification_to_fit_magnet_-_June_1_2017.pdfTBP1809.JPGTBP1808.JPG 
  36   Monday, June 05, 2017, 16:16 Isaac EarleBL4NDevelopmentBL4N 35-deg bender stand assembly completeAssembly
of two complete bender stands was completed
 14x 
  37   Wednesday, June 28, 2017, 17:37 Isaac EarleBL4NDevelopmentBL4N 35-deg bender "No. 1" installed on magnet stand BL4N 35-deg bender magnet "No.
1" has been installed onto the magnet
stand with "stand leg" configuration
 IMG_0259.JPGIMG_0260.JPGIMG_0258.JPG 