36
|
Monday, June 05, 2017, 16:16 |
Isaac Earle | BL4N | Development | BL4N 35-deg bender stand assembly complete | Assembly
of two complete bender stands was completed |
14x |
37
|
Wednesday, June 28, 2017, 17:37 |
Isaac Earle | BL4N | Development | BL4N 35-deg bender "No. 1" installed on magnet stand | BL4N 35-deg bender magnet "No.
1" has been installed onto the magnet
stand with "stand leg" configuration |
  |
40
|
Wednesday, March 13, 2019, 16:14 |
Isaac Earle | 100KW Beam Dump | Development | Testing EHD water leak detectors | The following work was completed today
on the EHD water leak sensors:
Mike Vogel installed a |
9x |
27
|
Monday, January 25, 2016, 13:20 |
Allon Messenberg | T-Hall Crane | Maintenance | Possible oil leak | Two small (approx. 5 cm across) puddles
of green fluid were discovered on the floor,
directly below the crane trolley. The |
  |
70
|
Thursday, October 17, 2024, 11:34 |
Albert Kong | Hot Cell 1 | Development | Tarping completed on hot cell roof | Two tarps were installed above the hot
cell roof to protect against concrete dust
while testing in the hot cell. |
  |
71
|
Tuesday, November 19, 2024, 15:38 |
Albert Kong | Hot Cell 1 | Standard Operation | APTW Front End Moved into Hot Cell | The APTW front end was moved into the hot
cell, on the lift table, following procedures
outlined in Document-244862. |
23x |
72
|
Wednesday, November 27, 2024, 18:38 |
Albert Kong | Hot Cell 1 | Standard Operation | APTW Front End Electrical Cable Replacement Testing | November 27, 2024
Testing completed:
Removal and re-insertion |
19x |
75
|
Wednesday, December 11, 2024, 11:45 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Service Tray and Associated Component Testing | Dec 10, 2024
Testing completed: |
16x |
78
|
Wednesday, January 15, 2025, 12:57 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Service Tray Flexible VCR Line Exchange Testing | Removal and replacement testing of the
stainless VCR lines extending from the HVFT
to the piston modules and FE plate is documented |
  |
79
|
Wednesday, January 15, 2025, 12:57 |
Albert Kong | Hot Cell 1 | Development | APTW Front End HTV Water Connector Exchange Testing | The four water connections on the front
end plate of the APTW that will connect to
the HTV were tested for replacement with |
    |
80
|
Wednesday, January 15, 2025, 13:09 |
Albert Kong | Hot Cell 1 | Repair | West turntable festooning pillar and cable damage | Some issues were encountered with the turntable
controls on the west hot cell, as a result
the festooning post for the turntable was |
|
81
|
Wednesday, January 15, 2025, 13:23 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Power Busbars Stabuli Connector Exchange | We successfully performed a removal and
replacement of a power busbar stabuli connector
on the front end plate where the HTV connects |
|
82
|
Wednesday, January 15, 2025, 13:52 |
Albert Kong | Hot Cell 1 | Development | APTW Front End VCR Gasket Selection | Today RH (CF and AK) agreed upon using
the following style of gaskets for the ARIEL
front ends: |
|
83
|
Thursday, February 13, 2025, 18:00 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Mid-Height and Upper VCR Joint Access and Service Testing | Feb 13:
The 'hanging' VCR joint on the driver
side was successfully exchanged by hand: |
|
84
|
Thursday, February 20, 2025, 14:44 |
Albert Kong | Hot Cell 1 | Development | APTW Front End KF Gasket Clamps Servicing Tests (By Gate Valve) | Covers testing for dealing with KF joints
by the gate valve on the FE.
Photos provided in PDF, download |
|
86
|
Thursday, March 20, 2025, 16:54 |
Albert Kong | Hot Cell 1 | Development | APTW Front End High Voltage Shielding Exchange Testing | Photos compiled in pdf, download to view
in case ELOG preview truncates.
------------------ |
 |
42
|
Tuesday, November 19, 2019, 10:31 |
Adam Newsome | T-Hall Crane | Repair | 900VFD Encoder Board Replacement | An issue arose in which the ARIEL crane hoist
could not be moved. It was determined that
the East and West drums were out of synchronization |
    |
43
|
Thursday, February 13, 2020, 08:51 |
Adam Newsome | T-Hall Crane | Standard Operation | Remote mode door limit switch bypass | The non-existent safety limit switch for
the target hall door which prevents remote
motion has been bypassed in the crane PLC |
|
44
|
Friday, July 03, 2020, 15:43 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist: West Travel Motion Failure | An issue was observed in which the North
Aux hoist failed to travel West when commanded
to, but the East motion was functioning. |
|
45
|
Wednesday, September 09, 2020, 10:51 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist Replacement (followup on E-Log 44) | See E-Log 44 for details on North Aux Hoist
failure.
A replacement VFD was ordered by |
|