Entry  Thursday, June 01, 2017, 15:25, Isaac Earle, BL4N, Development, BL4N 35-deg bender adjustment blocks modified to fit magnet Stress_analysis_on_TBP1808_and_1809_for_modification_to_fit_magnet_-_June_1_2017.pdfTBP1809.JPGTBP1808.JPG
Entry  Monday, June 05, 2017, 16:16, Isaac Earle, BL4N, Development, BL4N 35-deg bender stand assembly complete 14x
Entry  Wednesday, June 28, 2017, 17:37, Isaac Earle, BL4N, Development, BL4N 35-deg bender "No. 1" installed on magnet stand IMG_0259.JPGIMG_0260.JPGIMG_0258.JPG
Entry  Wednesday, March 13, 2019, 16:14, Isaac Earle, 100KW Beam Dump, Development, Testing EHD water leak detectors 9x
Entry  Wednesday, May 07, 2025, 13:50, Isaac Earle, Hot Cell 1, Development, Prototype testing of APTW beam dump module water connections Media.jpgMedia_(1).jpgMedia_(2).jpg
Entry  Monday, January 25, 2016, 13:20, Allon Messenberg, T-Hall Crane, Maintenance, Possible oil leak 20160122_161849.jpg20160122_161830.jpg20160125_100929.jpg
Entry  Thursday, October 17, 2024, 11:34, Albert Kong, Hot Cell 1, Development, Tarping completed on hot cell roof 90ab24ac-d55b-43ac-8630-02cd9ca2df85.jpgIMG_0325.JPEGIMG_0326.JPEG
Entry  Tuesday, November 19, 2024, 15:38, Albert Kong, Hot Cell 1, Standard Operation, APTW Front End Moved into Hot Cell 23x
Entry  Wednesday, November 27, 2024, 18:38, Albert Kong, Hot Cell 1, Standard Operation, APTW Front End Electrical Cable Replacement Testing 19x
Entry  Wednesday, December 11, 2024, 11:45, Albert Kong, Hot Cell 1, Development, APTW Front End Service Tray and Associated Component Testing 16x
Entry  Wednesday, January 15, 2025, 12:57, Albert Kong, Hot Cell 1, Development, APTW Front End Service Tray Flexible VCR Line Exchange Testing Feb13_ServiceTrayToFEPlateLinesExchangeTesting.pdfFeb_20_FE_Plate_Gas_Lines.pdfMar_06_Gas_Line_Exchange.pdf
Entry  Wednesday, January 15, 2025, 12:57, Albert Kong, Hot Cell 1, Development, APTW Front End HTV Water Connector Exchange Testing Screenshot_2025-01-15_121632.pngJan15_FE_Plate_Water_Lines.pdfJan23_FE_Plate_Water_Lines.pdfJan29_FE_Plate_Water_Lines.pdfFeb06_FinalHTVFEPlateWaterLineExchangeTesting.pdf
Entry  Wednesday, January 15, 2025, 13:09, Albert Kong, Hot Cell 1, Repair, West turntable festooning pillar and cable damage IMG_0973.JPEG
Entry  Wednesday, January 15, 2025, 13:23, Albert Kong, Hot Cell 1, Development, APTW Front End Power Busbars Stabuli Connector Exchange Jan_15_Stabuli.pdf
Entry  Wednesday, January 15, 2025, 13:52, Albert Kong, Hot Cell 1, Development, APTW Front End VCR Gasket Selection IMG_0960.JPEG
Entry  Thursday, February 13, 2025, 18:00, Albert Kong, Hot Cell 1, Development, APTW Front End Mid-Height and Upper VCR Joint Access and Service Testing Feb13_UpperVCRTesting.pdf
Entry  Thursday, February 20, 2025, 14:44, Albert Kong, Hot Cell 1, Development, APTW Front End KF Gasket Clamps Servicing Tests (By Gate Valve) Feb_20_FE_KF_Joint_Clamps.pdf
Entry  Thursday, March 20, 2025, 16:54, Albert Kong, Hot Cell 1, Development, APTW Front End High Voltage Shielding Exchange Testing HV_Shield_Testing_Mar_20.pdfApril_16.pdf
Entry  Tuesday, November 19, 2019, 10:31, Adam Newsome, T-Hall Crane, Repair, 900VFD Encoder Board Replacement IMG_20191106_140016.jpgIMG_20191106_153311.jpgIMG_20191112_114042.jpgHoist_Sync_3.jpgHoist_Sync_5.jpg
Entry  Thursday, February 13, 2020, 08:51, Adam Newsome, T-Hall Crane, Standard Operation, Remote mode door limit switch bypass 