Wednesday, January 15, 2025, 13:52 |
Albert Kong | Hot Cell 1 | Development | APTW Front End VCR Gasket Selection | Today RH (CF and AK) agreed upon using
the following style of gaskets for the ARIEL
front ends: |
|
|
81
|
Wednesday, January 15, 2025, 13:23 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Power Busbars Stabuli Connector Exchange | We successfully performed a removal and
replacement of a power busbar stabuli connector
on the front end plate where the HTV connects |
|
|
80
|
Wednesday, January 15, 2025, 13:09 |
Albert Kong | Hot Cell 1 | Repair | West turntable festooning pillar and cable damage | Some issues were encountered with the turntable
controls on the west hot cell, as a result
the festooning post for the turntable was |
|
|
79
|
Wednesday, January 15, 2025, 12:57 |
Albert Kong | Hot Cell 1 | Development | APTW Front End HTV Water Connector Exchange Testing | The four water connections on the front
end plate of the APTW that will connect to
the HTV were tested for replacement with |
|
|
78
|
Wednesday, January 15, 2025, 12:57 |
Albert Kong | Hot Cell 1 | Development | APTW Front End HTV Water Connector Exchange Testing | The four water connections on the front
end plate of the APTW that will connect to
the HTV were tested for replacement with |
|
|
77
|
Thursday, December 12, 2024, 16:20 |
Aaron Tam | Hot Cell 1 | Development | Extraction Electrode Banana Plug (Show and Tell) | December 12, 2024 - Chad
Fisher, Albert Kong, Aaron Tam, Austin Hagen
Tests: |
6x |
|
76
|
Thursday, December 12, 2024, 15:57 |
Aaron Tam | Hot Cell 1 | Development | Pistons Gas lines exchange | December 12, 2024 - Chad Fisher,
Albert Kong, Aaron Tam
Tests: |
13x |
|
75
|
Wednesday, December 11, 2024, 11:45 |
Albert Kong | Hot Cell 1 | Development | APTW Front End Service Tray and Associated Component Testing | Dec 10, 2024
Testing completed: |
16x |
|
74
|
Friday, November 29, 2024, 15:23 |
Adam Newsome | Hot Cell 1 | Maintenance | 1000 kg crane: y axis position display not functioning | After a recent power cycle, the y-axis
referencing was lost for the 1000 kg crane.
The position readout was also incorrect, |
|
|
73
|
Thursday, November 28, 2024, 09:04 |
Adam Newsome | Hot Cell 1 | Repair | Hot Cell turntables not rotating, access hatch not moving | It was reported that the hot cell turntables
would not rotate and the access hatch could
not be operated. The turntables' elevation |
|
|
72
|
Wednesday, November 27, 2024, 18:38 |
Albert Kong | Hot Cell 1 | Standard Operation | APTW Front End Electrical Cable Replacement Testing | November 27, 2024
Testing completed:
Removal and re-insertion |
19x |
|
71
|
Tuesday, November 19, 2024, 15:38 |
Albert Kong | Hot Cell 1 | Standard Operation | APTW Front End Moved into Hot Cell | The APTW front end was moved into the hot
cell, on the lift table, following procedures
outlined in Document-244862. |
23x |
|
70
|
Thursday, October 17, 2024, 11:34 |
Albert Kong | Hot Cell 1 | Development | Tarping completed on hot cell roof | Two tarps were installed above the hot
cell roof to protect against concrete dust
while testing in the hot cell. |
|
|
69
|
Thursday, October 10, 2024, 12:22 |
Adam Newsome | Hot Cell 1 | Standard Operation | Safety Walkaround Complete - Hot Cell area | A safety walkaround was completed for the
ARIEL Hot Cell area.
The resulting spreadsheet can be |
|
|
68
|
Tuesday, September 10, 2024, 13:03 |
Adam Newsome | Hot Cell 1 | Development | Spacer flange installation | The spacer flanges were installed on both
turntables today.
See photos and information in the |
|
|
67
|
Tuesday, September 10, 2024, 12:52 |
Adam Newsome | T-Hall Crane | Standard Operation | Drive not ready faults observed on power-up | Upon powering on the crane today and attempting
to use the main hoist, the following faults
were present: |
|
|
66
|
Wednesday, July 17, 2024, 15:07 |
Adam Newsome | Hot Cell 1 | Standard Operation | Safety Walkaround Complete - B2 Level | A safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report. |
|
|
65
|
Wednesday, April 24, 2024, 09:17 |
Adam Newsome | T-Hall Crane | Repair | Target Hall Crane: VFD DC bus undervoltage fault [root cause: encoder board failure on 900VFD] | On 2024-04-22 around 3:30 pm it was discovered
that the crane's main hoist was in a faulted
state. The operator (Adam Newsome) experienced |
|
|
64
|
Wednesday, February 14, 2024, 09:02 |
Adam Newsome | T-Hall Crane | Maintenance | Target Hall Crane: Trolley Encoder Homing | The main trolley's E/W motion was observed
to be slowed on 2024-02-13.
Upon investigation, the following |
|
|
63
|
Wednesday, August 02, 2023, 09:13 |
chad fisher | Hot Cell 1 | Repair | Leak Rate Testing | On August 1, 2023 HC1 was pumped down to
-1200 Pa (gauge) and then valved off to test
the leak rate after turntables had been sealed |
|