Entry  Tuesday, April 15, 2025, 10:35, Riley Sykes, Hot Cell 1, Repair, North Roxtec Hinge and door. Image_(7).jfif
Entry  Wednesday, April 09, 2025, 15:31, Adam Newsome, Hot Cell 1, Development, Two jib cranes installed ACDC_CRANES_3500_Job_10098_General_Quote24_2.pdfPXL_20250409_175712902.MP.jpgPXL_20250409_175730905.MP.jpg
Entry  Thursday, March 20, 2025, 16:54, Albert Kong, Hot Cell 1, Development, APTW Front End High Voltage Shielding Exchange Testing HV_Shield_Testing_Mar_20.pdfApril_16.pdf
Entry  Monday, March 10, 2025, 11:35, Jason Zhang, Hot Cell 1, Development, ARIEL Hot Cell PLC Update - 1000kg Crane Travel Zone 
Entry  Thursday, February 20, 2025, 14:44, Albert Kong, Hot Cell 1, Development, APTW Front End KF Gasket Clamps Servicing Tests (By Gate Valve) Feb_20_FE_KF_Joint_Clamps.pdf
Entry  Thursday, February 13, 2025, 18:00, Albert Kong, Hot Cell 1, Development, APTW Front End Mid-Height and Upper VCR Joint Access and Service Testing Feb13_UpperVCRTesting.pdf
Entry  Wednesday, January 15, 2025, 13:52, Albert Kong, Hot Cell 1, Development, APTW Front End VCR Gasket Selection IMG_0960.JPEG
Entry  Wednesday, January 15, 2025, 13:23, Albert Kong, Hot Cell 1, Development, APTW Front End Power Busbars Stabuli Connector Exchange Jan_15_Stabuli.pdf
Entry  Wednesday, January 15, 2025, 13:09, Albert Kong, Hot Cell 1, Repair, West turntable festooning pillar and cable damage IMG_0973.JPEG
Entry  Wednesday, January 15, 2025, 12:57, Albert Kong, Hot Cell 1, Development, APTW Front End HTV Water Connector Exchange Testing Screenshot_2025-01-15_121632.pngJan15_FE_Plate_Water_Lines.pdfJan23_FE_Plate_Water_Lines.pdfJan29_FE_Plate_Water_Lines.pdfFeb06_FinalHTVFEPlateWaterLineExchangeTesting.pdf
Entry  Wednesday, January 15, 2025, 12:57, Albert Kong, Hot Cell 1, Development, APTW Front End Service Tray Flexible VCR Line Exchange Testing Feb13_ServiceTrayToFEPlateLinesExchangeTesting.pdfFeb_20_FE_Plate_Gas_Lines.pdfMar_06_Gas_Line_Exchange.pdf
Entry  Thursday, December 12, 2024, 16:20, Aaron Tam, Hot Cell 1, Development, Extraction Electrode Banana Plug (Show and Tell) 6x
Entry  Thursday, December 12, 2024, 15:57, Aaron Tam, Hot Cell 1, Development, APTW Pistons Gas lines exchange testing 13x
Entry  Wednesday, December 11, 2024, 11:45, Albert Kong, Hot Cell 1, Development, APTW Front End Service Tray and Associated Component Testing 16x
Entry  Friday, November 29, 2024, 15:23, Adam Newsome, Hot Cell 1, Maintenance, 1000 kg crane: y axis position display not functioning PXL_20241202_204356508.jpg
Entry  Thursday, November 28, 2024, 09:04, Adam Newsome, Hot Cell 1, Repair, Hot Cell turntables not rotating, access hatch not moving 
Entry  Wednesday, November 27, 2024, 18:38, Albert Kong, Hot Cell 1, Standard Operation, APTW Front End Electrical Cable Replacement Testing 19x
Entry  Tuesday, November 19, 2024, 15:38, Albert Kong, Hot Cell 1, Standard Operation, APTW Front End Moved into Hot Cell 23x
Entry  Thursday, October 17, 2024, 11:34, Albert Kong, Hot Cell 1, Development, Tarping completed on hot cell roof 90ab24ac-d55b-43ac-8630-02cd9ca2df85.jpgIMG_0325.JPEGIMG_0326.JPEG
Entry  Thursday, October 10, 2024, 12:22, Adam Newsome, Hot Cell 1, Standard Operation, Safety Walkaround Complete - Hot Cell area 