64
|
Monday, December 16, 2024, 12:15 |
Aaron Schmidt | Completed | | Q4 - 2024 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
63
|
Thursday, November 21, 2024, 11:48 |
Aaron Schmidt | | | Change glove on Ar Glove box (2) | Thursday, November 21, 2024, 11:46:
2 Glovebox gloves were changed. The far right
glove & the far left glove. |
|
62
|
Tuesday, October 15, 2024, 09:21 |
Darwin Ortiz Rosales | Fixed | | Hotlab glovebox catalyst regeneration | Tuesday, October 15, 2024, 09:22
The glovebox catalyst was regenerated.
No issues. Removed TCE and PVB from |
|
61
|
Thursday, August 01, 2024, 15:03 |
Darwin Ortiz Rosales | | | | Ultrasonicator in Cold Lab: The ultrasonicator
cooling lines and their operation was checked.
The functionality of the probe and operation |
|
60
|
Thursday, August 01, 2024, 15:01 |
Darwin Ortiz Rosales | | | EVAP1 and EVAP2 Inspection and Maintenance | Thursday, August 01, 2024, 14:56
EVAP1: Checked seal and no
visible deterioration was observed. |
|
59
|
Thursday, July 11, 2024, 13:40 |
Aaron Schmidt | | | Q2 - 2024 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
58
|
Thursday, June 20, 2024, 13:33 |
Darwin Ortiz Rosales | Fixed | | Glovebox inspection ISAC1 B1 L06 | Thursday, June 20, 2024, 13:28
All lines, pump, blower, were |
|
57
|
Monday, April 15, 2024, 10:52 |
Aaron Schmidt | Fixed | | Ar Glove box RP swapped. | Monday, April 15, 2024, 10:50: The
old IDP15 RP was not pumping the antechamber
down properly. An exchange IDP15 pump is |
|
56
|
Wednesday, March 27, 2024, 13:42 |
Keyur Chauhan | | | Actinide Mass Balance Calibration ISAC-I B1 Hot Lab | ISAC-1
B1 Hot Lab actinide mass balance calibration |
|
55
|
Tuesday, March 12, 2024, 15:21 |
Darwin Ortiz Rosales | Fixed | | Glovebox regeneration and O2 sensor replacement(B1 L06, Hotlab) | Tuesday, March 12, 2024, 15:21
Hotlab ISAC1 B1
Normal
0
|
|
54
|
Friday, February 09, 2024, 11:01 |
Aaron Schmidt | | | Laser cutter inspection | Friday, February 09, 2024, 11:01:
Epilog laser cutter operates. OK |
|
53
|
Friday, January 19, 2024, 10:20 |
Darwin Ortiz Rosales | Fixed | | Glovebox regeneration (B1 L06, Hotlab) | Friday, January 19, 2024, 10:19
This is a belated entry. The
regeneration was performed successfully on |
|
52
|
Friday, January 19, 2024, 10:18 |
Darwin Ortiz Rosales | Fixed | | Inspection of Glovebox inside B1 L06 (hotlab) | Friday, January 19, 2024, 10:10
This is a belated entry. The
inspection was performed on December 19, |
|
51
|
Tuesday, December 12, 2023, 13:12 |
Aaron Schmidt | | | Q4 - 2023 Ball Mill Calibration & Inspection | Fritsch |
|
50
|
Thursday, November 30, 2023, 10:03 |
Aaron Schmidt | Fixed | | Ar Glove box - Blower / solenoid fix | On November 10th / 11th a site wide
power outage occured. Once power was restored,
the Ar glove box had intermittent issues |
|
49
|
Tuesday, August 01, 2023, 12:31 |
Darwin Ortiz Rosales | | | Evap1 and Evap2 Inspection and Maintenance | Evap1: Cleaned and checked seals.
Oil level could not be clearly determined,
but are consulting with pump group to check. |
|
48
|
Friday, June 30, 2023, 12:21 |
Aaron Schmidt | | | Q2 - 2023 Ball Mill Calibration & Inspection | Fritsch |
|
47
|
Tuesday, June 20, 2023, 15:11 |
Darwin Ortiz Rosales | Fixed | | Inspection ISAC 1 B1 L06 Glovebox | On Monday June 19th, the Glove box was
inspected. Gas lines, solenoids, pump,
argon usage, state of gloves and gas levels |
|
46
|
Tuesday, April 18, 2023, 17:40 |
Keyur Chauhan | Fixed | 1 | Actinide Mass Balance Calibration | ISAC-1 B1 Hot Lab
actinide mass balance calibration was carried
out on April 18, 2023, at 10:40 a.m. with |
|
45
|
Thursday, February 02, 2023, 10:30 |
Aaron Schmidt | | | Eyewash & Shower Station OK | Thursday, February 02, 2023, 10:14:
Cold Lab Eyewash & shower station ran.
Ok. |
|
44
|
Friday, December 16, 2022, 07:36 |
Aaron Schmidt | | | Q4 - 2022 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
43
|
Tuesday, July 12, 2022, 11:08 |
Aaron Schmidt | | | Q2 - 2022 Ball Mill Calibration & Inspection | Fritsch
Pulverisette 5 Ball Mill status:
|
|
42
|
Thursday, April 07, 2022, 12:21 |
Aaron Schmidt | Fixed | | Ar glove box roughing pump. | Thursday, April 07, 2022, 12:00: While
preparing to remove LaC, the roughing pump
(1) stopped operating. It didn't appear to |
|
41
|
Thursday, April 07, 2022, 12:00 |
Aaron Schmidt | Under Process | | Ar Glove box issue & LaC removal. | Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that
the glove box was not regulating pressure |
|
40
|
Thursday, January 20, 2022, 13:38 |
Carla Babcock | | | Testing of spare FUG bias supply | Tomislav and John Chow tested the spare
bias supply located in the rack of the electrical
services room. This is a FUG HCN 1400 M-60000, |
|
39
|
Tuesday, December 07, 2021, 09:23 |
Aaron Schmidt | | | Q4 - 2021 Ball Mill Calibration & Inspection | Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected. |
|
38
|
Tuesday, August 03, 2021, 10:34 |
Aaron Schmidt | | | Q2 - 2021 Ball Mill Calibration & Inspection | |
|
37
|
Tuesday, February 09, 2021, 06:56 |
Aaron Schmidt | | | Planned power outage. | Tuesday, February 09, 2021, 06:53: Evaporator
2 off. Evaporator 1 ok, Fume hoods ok. Ar
glove box off. Ready for planned power outage. |
|
36
|
Friday, December 04, 2020, 12:58 |
Aaron Schmidt | | | Q4 - 2020 Ball Mill Calibration & Inspection | |
|
35
|
Wednesday, September 16, 2020, 10:42 |
Aaron Schmidt | | | Ball Mill troubleshoot. | Odd noises reported. Darwin &
Marla. "Like a rock caught in a
fan" |
|
34
|
Wednesday, August 05, 2020, 19:50 |
Darwin Ortiz Rosales | Fixed | 1 | Hot Lab Glove Box Regeneration | Wednesday, August 05, 2020, 19:34
On Friday July 31 a regeneration
of the glovebox was started. |
|
33
|
Monday, July 13, 2020, 11:23 |
Aaron Schmidt | | | Q2 - 2020 Ball mill inspection | Fritsch |
|
32
|
Monday, July 13, 2020, 11:07 |
Aaron Schmidt | | | Eye wash temp | Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg |
|
31
|
Friday, April 24, 2020, 16:27 |
Anders Mjos | | | Lab check in |
|
|
30
|
Wednesday, April 08, 2020, 11:40 |
Anders Mjos | | | Lab check in | Checked in on the labs and other equipment
yesterday. Everything looks ok, including
the glove box Ar supply. Recorded O2 and |
|
29
|
Monday, January 13, 2020, 13:27 |
Aaron Schmidt | Under Process | | Leaking pipe in HC area | Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
|
|
28
|
Wednesday, December 18, 2019, 13:50 |
Aaron Schmidt | | | Q4-2019 Ball Mill calibration & inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
27
|
Friday, September 27, 2019, 13:55 |
Aaron Schmidt | | | DI water supply leak outside room 06 - ISAC B1 | Friday, September 27, 2019, 13:54:
There is a pin hole water leak coming
from the DIW supply pipe going into the ISAC |
|
26
|
Friday, July 26, 2019, 13:06 |
Aaron Schmidt | | | Q2 - 2019 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status:
SN 05.6010 / 03005: Inspected July |
|
25
|
Wednesday, April 24, 2019, 10:19 |
Aaron Schmidt | Fixed | | Cold Lab back sink leak |
Wednesday, April 24, 2019,
10:00: |
|
24
|
Thursday, March 21, 2019, 07:43 |
Aaron Schmidt | | | Argon Glove box repair & link to nuclear ventilation | The Ar glove box issues ( https://elog.triumf.ca/TIS/General/23
) have been fixed.
Quoted from work permit: |
6x |
23
|
Thursday, February 07, 2019, 10:42 |
Aaron Schmidt | | | Argon Glove box leak / regeneration failure |
A regeneration of the Ar Glove box
had been performed Monday, 04, Feb, 2019. |
7x |
22
|
Monday, April 09, 2018, 15:59 |
Laura Lambert | Fixed | | Glove box leak in hot lab | Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was
used up, indicating a leak somewhere in the |
|
21
|
Wednesday, January 31, 2018, 13:35 |
Laura Lambert | | | New lab safety mirrors installed in hot lab | Wednesday, January 31, 2018, 13:31
3 x lab safety mirrors have been
installed in the hot lab, now all locations |
|
20
|
Tuesday, January 23, 2018, 11:58 |
Laura Lambert | | | All BeO removed from Labs! | Tuesday, January 23, 2018, 11:55
Portable glove box with everything
inside, contaminated beakers, pellets and |
|
19
|
Wednesday, December 20, 2017, 09:16 |
Laura Lambert | | | RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 | Wednesday, December 20, 2017, 09:02
Replaced Argon tank |
|
18
|
Tuesday, August 08, 2017, 14:55 |
Laura Lambert | | | Glove box Alarm | Tuesday, August 08, 2017, 14:28
Alarm for glove box went off this
afternoon. |
|
17
|
Thursday, July 13, 2017, 15:12 |
Laura Lambert | Under Process | | D.H.W leak in SEM lab | Thursday, July 13, 2017, 14:53
Same pipe that had a leak in the
cold lab ~1 month ago now has leak in SEM |
|
16
|
Wednesday, April 05, 2017, 08:22 |
Aaron Schmidt | Fixed | | D.H.W.R Leak | When: 04/04/17 Between 09:00 & 11:30
Where:
ISAC 1 – Cold Lab
Who: Ron Murray & Aaron
Schmidt
A pin hole leak was found in the |
|
15
|
Thursday, March 16, 2017, 09:32 |
Aaron Schmidt | Fixed | | D.H.W water pipe replacement | Fri 03/03/2017 17:00 - A water leak was noticed
on the D.H.W line. Hot water to the Cold
lab was shut down.
Wed 15/03/17 11:00 |
|
14
|
Wednesday, November 26, 2014, 14:01 |
Laura Lambert | | | | |
|
13
|
Friday, March 15, 2013, 13:55 |
Anders Mjos | | | Non active water off for a short time (10 - 15 min) | ISAC operations called to check that equipment
in the labs were OK for the non active water
to be off for a short time. I gave the OK |
|
12
|
Tuesday, February 28, 2012, 12:01 |
John Wong | | | TIS/RH Users | Tuesday, February 28, 2012, 11:31
Hi All,
Hope you all find the TIS/RH elog |
|
11
|
Thursday, February 23, 2012, 13:38 |
Anders Mjos | Fixed | | Water leak in chemistry / cold lab | Please see attached file for notes
on the water leak from the cold lab fume
hood Tuesday Feb 21. |
|
10
|
Thursday, September 08, 2011, 15:41 |
Anders Mjos | Fixed | 1 | Evaporator#1 glovebox repairing |
|
|
9
|
Friday, August 19, 2011, 10:04 |
John Wong | Under Process | 1 | Evaporator#1 glovebox repairing | The evaporator#1 glovebox is leaking from
the gloves, around the ports, and the base
(possible more places). It is evident |
|
8
|
Tuesday, July 19, 2011, 16:26 |
John Wong | Fixed | | Planetary Ball Mill moved to Hotlab | Tuesday, July 19, 2011, 16:22: The
planetary ball mill was in the coldlab, and
now it has moved to the hot lab for the purpose |
|
7
|
Friday, June 24, 2011, 18:00 |
John Wong | Under Process | | TIS New Users | Hi All,
As requested by Pierrer Bricault,
I have added the following users to |
|
6
|
Tuesday, June 21, 2011, 16:38 |
John Wong | Fixed | | Planetary Ball Mill Re-Commisioning | Tue Jun 21 16:30:48 2011:
Re-Cap: On June 13, 2011, the
milling jar gasket seal partially came out |
|
5
|
Friday, May 13, 2011, 11:59 |
John Wong | Fixed | | Uranium Waste Container Removed from Hotlab | Fri May 13 11:55:37 2011: The contain
in the uranium waste container was removed
and transferred into a beaker and sealed. |
|
4
|
Wednesday, April 13, 2011, 13:54 |
John Wong | | | Cloth booties now avaiable for hotlab | Wed Apr 13 13:53:46 2011
I've setup a box of cloth booties
for entering the hotlab. They are
washable |
|
3
|
Tuesday, April 12, 2011, 12:07 |
John Wong | | | All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down |
|
|
2
|
Tuesday, April 12, 2011, 12:03 |
John Wong | | | Hot Lab Glove Box Regeneration | Tue Apr 12 12:00:52 2011: The hot
lab glove box regeneration was started yesterday
(April 11, 2011). "Before regeneration, |
|
1
|
Wednesday, March 30, 2011, 16:47 |
John Wong | | | All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down | All the fumehood pumps in the ISAC-I hot
and cold labs got tripped off when the MCC-X
was powered down (See ISAC WP#2011-03-30-5). |
|