Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance  Not logged in ELOG logo
Message ID: 62     Entry time: Tuesday, October 15, 2024, 09:21
Author: Darwin Ortiz Rosales 
Status: Fixed 
Test:  
Subject: Hotlab glovebox catalyst regeneration 

Tuesday, October 15, 2024, 09:22

The glovebox catalyst was regenerated.  No issues.  Removed TCE and PVB from inside the glovebox.  These were vestiges from the previous UCx production process.

ELOG V2.9.2-2455