Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance  Not logged in ELOG logo
Message ID: 67     Entry time: Thursday, March 20, 2025, 13:50
Author: Keyur Chauhan 
Status:  
Test:  
Subject: Actinide Mass Balance Calibration ISAC-I B1 Hot Lab  

 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 11, 2025, at 2:00 p.m. with an accuracy of 0.02%.

Attachment 1: Actinide_Mass_Balance_-_11_Mar_2025.pdf  63 kB  | Show | Hide all
ELOG V2.9.2-2455