Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance  Not logged in ELOG logo
Message ID: 60     Entry time: Thursday, August 01, 2024, 15:01
Author: Darwin Ortiz Rosales 
Status:  
Test:  
Subject: EVAP1 and EVAP2 Inspection and Maintenance 

Thursday, August 01, 2024, 14:56

EVAP1:  Checked seal and no visible deterioration was observed.  Oil level in roughing pump was good.  Circulated argon to observe functionality of the gloves and to check appropriate gas flow. 

EVAP2:  Visually inspected the connections at the back of the evaporator.  A loose connection had been observed on the previous day but fixed.  Roughing pump running well and system operational.  The door seal could not be checked but it is working properly as evidenced by the fact that the evaporator was in use. No major maintenance required at this moment.

ELOG V2.9.2-2455