ID |
Date |
Author |
Status |
Test |
Subject |
Text |
 |
26
|
Friday, July 26, 2019, 13:06 |
Aaron Schmidt | | | Q2 - 2019 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status:
SN 05.6010 / 03005: Inspected July |
|
25
|
Wednesday, April 24, 2019, 10:19 |
Aaron Schmidt | Fixed | | Cold Lab back sink leak |
Wednesday, April 24, 2019,
10:00: |
|
24
|
Thursday, March 21, 2019, 07:43 |
Aaron Schmidt | | | Argon Glove box repair & link to nuclear ventilation | The Ar glove box issues ( https://elog.triumf.ca/TIS/General/23
) have been fixed.
Quoted from work permit: |
6x |
23
|
Thursday, February 07, 2019, 10:42 |
Aaron Schmidt | | | Argon Glove box leak / regeneration failure |
A regeneration of the Ar Glove box
had been performed Monday, 04, Feb, 2019. |
7x |
22
|
Monday, April 09, 2018, 15:59 |
Laura Lambert | Fixed | | Glove box leak in hot lab | Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was
used up, indicating a leak somewhere in the |
   |
21
|
Wednesday, January 31, 2018, 13:35 |
Laura Lambert | | | New lab safety mirrors installed in hot lab | Wednesday, January 31, 2018, 13:31
3 x lab safety mirrors have been
installed in the hot lab, now all locations |
 |
20
|
Tuesday, January 23, 2018, 11:58 |
Laura Lambert | | | All BeO removed from Labs! | Tuesday, January 23, 2018, 11:55
Portable glove box with everything
inside, contaminated beakers, pellets and |
|
19
|
Wednesday, December 20, 2017, 09:16 |
Laura Lambert | | | RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 | Wednesday, December 20, 2017, 09:02
Replaced Argon tank |
|
18
|
Tuesday, August 08, 2017, 14:55 |
Laura Lambert | | | Glove box Alarm | Tuesday, August 08, 2017, 14:28
Alarm for glove box went off this
afternoon. |
|
17
|
Thursday, July 13, 2017, 15:12 |
Laura Lambert | Under Process | | D.H.W leak in SEM lab | Thursday, July 13, 2017, 14:53
Same pipe that had a leak in the
cold lab ~1 month ago now has leak in SEM |
   |
16
|
Wednesday, April 05, 2017, 08:22 |
Aaron Schmidt | Fixed | | D.H.W.R Leak | When: 04/04/17 Between 09:00 & 11:30
Where:
ISAC 1 – Cold Lab
Who: Ron Murray & Aaron
Schmidt
A pin hole leak was found in the |
|
15
|
Thursday, March 16, 2017, 09:32 |
Aaron Schmidt | Fixed | | D.H.W water pipe replacement | Fri 03/03/2017 17:00 - A water leak was noticed
on the D.H.W line. Hot water to the Cold
lab was shut down.
Wed 15/03/17 11:00 |
|
14
|
Wednesday, November 26, 2014, 14:01 |
Laura Lambert | | | | |
|
13
|
Friday, March 15, 2013, 13:55 |
Anders Mjos | | | Non active water off for a short time (10 - 15 min) | ISAC operations called to check that equipment
in the labs were OK for the non active water
to be off for a short time. I gave the OK |
|
12
|
Tuesday, February 28, 2012, 12:01 |
John Wong | | | TIS/RH Users | Tuesday, February 28, 2012, 11:31
Hi All,
Hope you all find the TIS/RH elog |
|
11
|
Thursday, February 23, 2012, 13:38 |
Anders Mjos | Fixed | | Water leak in chemistry / cold lab | Please see attached file for notes
on the water leak from the cold lab fume
hood Tuesday Feb 21. |
|
10
|
Thursday, September 08, 2011, 15:41 |
Anders Mjos | Fixed | 1 | Evaporator#1 glovebox repairing |
|
|
9
|
Friday, August 19, 2011, 10:04 |
John Wong | Under Process | 1 | Evaporator#1 glovebox repairing | The evaporator#1 glovebox is leaking from
the gloves, around the ports, and the base
(possible more places). It is evident |
|
8
|
Tuesday, July 19, 2011, 16:26 |
John Wong | Fixed | | Planetary Ball Mill moved to Hotlab | Tuesday, July 19, 2011, 16:22: The
planetary ball mill was in the coldlab, and
now it has moved to the hot lab for the purpose |
|
7
|
Friday, June 24, 2011, 18:00 |
John Wong | Under Process | | TIS New Users | Hi All,
As requested by Pierrer Bricault,
I have added the following users to |
|