Wednesday, March 30, 2011, 16:47, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down
|
Tuesday, April 12, 2011, 12:07, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down
|
|
Message ID: 1
Entry time: Wednesday, March 30, 2011, 16:47
Reply to this: 3
|
Author: |
John Wong |
Status: |
|
Test: |
|
Subject: |
All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down |
|
|
All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). No reaction process is done inside the fumehoods, so the pumps are ok to be left off for now until the MCC-X work is done. |