Message ID: 58     Entry time: Thursday, June 20, 2024, 13:33
Author: Darwin Ortiz Rosales 
Status: Fixed 
Test:  
Subject: Glovebox inspection ISAC1 B1 L06 

 Thursday, June 20, 2024, 13:28

All lines, pump, blower, were found in working condition. From a previous issue with corrosion of lines connecting pumps, it is recommended that we check the ability of the pump to achieve full vacuum during inspections.  Currently full vacuum was observed while checking.  

The nipple connecting the argon gas tank to the regulator needs replacing.  Aaron will order it.  