Tue Jun 21 16:30:48 2011:
Re-Cap: On June 13, 2011, the milling jar gasket seal partially came out during the high speed milling (400RPM), and the ball mill was contaminated with UO2/C mixture (See TIS/Target Production message ID#9, UCx#2, for more details).
Today, the ball mill was successfully re-commissioned. RPG's helped to take some air samples during the commissioning, and nothing above the background was detected. The cold-lab is now re-open back; no booties are required. The commissioning plan and commissioning report are available on DocuShare. |