Message ID: 70     Entry time: Friday, June 20, 2025, 21:35
Author: Darwin Ortiz Rosales 
Status: Completed 
Test:  
Subject: glovebox Inspection ISAC1 L06  

 Friday, June 20, 2025, 17:30

All lines, pump, blower, were found in working condition the previous week but noticed that the Argon level might be going down too fast.  Decided to further observe the Argon levels.  

Did leak checks for copper connections and checked the gloves.  No leaks were found. 

Today, normal decrease was observed compared to last week. A refurbishing kit was ordered for the glovebox to replace the regeneration catalyst and the solenoids.  