589
|
Thursday, August 25, 2022, 10:16 |
Darwin Ortiz Rosales | TiC | 44692-10 | HP-FEBIAD | Done | TiC 220818 Sintering (TiC #6) | Thursday, August 25, 2022, 10:06
Target container is loaded with 379 |
|
588
|
Wednesday, August 10, 2022, 09:31 |
Ivan Bao | Empty | | TARGET BOAT | In progress | TC tests | 1st test polarity 1
10:12 am Begin pumping down to rough
vacuum |
|
587
|
Thursday, August 04, 2022, 09:31 |
Ferran Boix Pamies | Empty | | TARGET BOAT | In progress | TC on Ta boat test. | 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31 |
|
586
|
Wednesday, June 29, 2022, 10:12 |
Darwin Ortiz Rosales | TaC | 44692-10 | HP-FEBIAD | Done | TaC coating sintering | Wednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated |
|
585
|
Tuesday, June 28, 2022, 09:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | In progress | TC test on Ta tube | Tuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night. |
|
584
|
Tuesday, June 21, 2022, 09:48 |
Darwin Ortiz Rosales | SiC | 37978-1 | HP-FEBIAD | Done | T-220617 sintering | Tuesday, June 21, 2022, 09:43
Total number of foils: |
|
583
|
Monday, June 20, 2022, 14:52 |
Darwin Ortiz Rosales | Empty | | | Done | softstart of new TP | Monday, June 20, 2022, 14:50
A new Turbo pump was installed this
morning and it was soft started. It |
|
582
|
Tuesday, June 14, 2022, 09:04 |
Darwin Ortiz Rosales | Ta | 37978-1 | HP-FEBIAD | Done | TaC coating sintering | Tuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated |
|
581
|
Thursday, June 09, 2022, 19:20 |
John Wong | | boat | | Done | carbonize PAN 10% discs |
|
    |
580
|
Thursday, June 09, 2022, 09:09 |
Darwin Ortiz Rosales | Ta | | HP-FEBIAD | Done | Troubleshooting | Thursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022
@ ~3.00 pm a "dummy" target container |
  |
579
|
Wednesday, June 08, 2022, 10:00 |
Flora Wu | | boat | | Done | carbonize PAN 10% discs | Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun |
|
578
|
Tuesday, June 07, 2022, 07:31 |
Darwin Ortiz Rosales | SiC | 42464-2 | HP-FEBIAD | Done | T-220524 Sintering SiC | Tuesday, June 07, 2022, 07:19
Total number of foils: |
|
577
|
Thursday, June 02, 2022, 16:53 |
Aaron Schmidt | Ta | 44691-12 | LP-SIS | In progress | Conditioning Ta#64 | Ta#64 LP-SIS target
description: |
|
576
|
Wednesday, May 18, 2022, 09:59 |
Darwin Ortiz Rosales | SiC | 44692-9 | HP-FEBIAD | Done | T-220516 Sintering SiC | Wednesday, May 18, 2022, 09:46
Total number of foils: |
|
575
|
Tuesday, May 10, 2022, 14:43 |
Aaron Schmidt | | | | Maintenance | Active TP removed / Swap / Slow start TP | Tuesday, May 10, 2022, 14:42: TV551
Varian. SN: 202311 (Slightly active from |
|
574
|
Monday, April 25, 2022, 08:31 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK sample test 2 | Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. |
|
573
|
Thursday, April 21, 2022, 09:45 |
Darwin Ortiz Rosales | TaC | 42218-2 | LP-IG-LIS | Done | TaC coating | Thursday, April 21, 2022, 09:43
TaC coated Target container was placed
in Evaporator 2 yesterday and left pressuring |
|
572
|
Sunday, April 17, 2022, 10:37 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK samples heat test | Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend. |
|
571
|
Tuesday, April 12, 2022, 13:41 |
Aaron Schmidt | | | | Maintenance | New Flex - line HS installed | Old HS sprang a leak in the copper tubing.
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. |
|
570
|
Wednesday, March 23, 2022, 10:52 |
Darwin Ortiz Rosales | TaC | 44692-9 | HP-FEBIAD | Done | TaC coating | Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated |
|
|