  Evaporator_2, Page 3 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  649   Monday, November 06, 2023, 14:07 Darwin Ortiz RosalesEmpty45220-4LP-SISDoneTaC coating sinteringMonday, November 06, 2023, 09:59
The coated container was wrapped
in 4 Ta foil heatshields.
  
  648   Friday, October 20, 2023, 07:24 Darwin Ortiz RosalesTaC45447-11LP-SISDoneTaC coating sinteringFriday, October 20, 2023, 07:20
The coated container was wrapped
in 4 Ta foil heatshields.
  
  647   Thursday, October 05, 2023, 12:47 Aaron SchmidtTa45220-3LP-SISIn progressConditioning Ta#68 (Spare)Ta#(Spare) LP-SIS   
  646   Wednesday, September 20, 2023, 14:26 Aaron SchmidtTa45220-5LP-SISIn progressConditioning Ta#66 Ta#66 LP-SIS   
  645   Tuesday, September 12, 2023, 09:54 Darwin Ortiz RosalesTaC41369-2HP-SISDoneTaC coating sinteringTuesday, September 12, 2023, 09:51
The coated container was wrapped
in 3 Ta foil heatshield and left in evap2
  
  644   Thursday, August 31, 2023, 07:09 Darwin Ortiz RosalesTaC45447-4HP-FEBIADDoneTaC coating sinteringThursday, August 31, 2023, 07:07
The coated container was wrapped
in 3 Ta foil heatshields.
  
  643   Tuesday, August 29, 2023, 12:47 Darwin Ortiz RosalesTaC45220-10LP-SISDoneTaC coating sinteringTuesday, August 29, 2023, 12:46
The coated container was wrapped
in 4 Ta foil heatshields.
  
  642   Saturday, August 26, 2023, 09:41 Darwin Ortiz RosalesTaC45447-12LP-SISDoneTaC coating sintering
Saturday, August 26, 2023, 09:39
The coated container was wrapped
in 4 Ta foil heatshields.
  
  641   Thursday, August 24, 2023, 14:18 Aaron SchmidtNb45447-9LP-IG-LISIn progressConditioning Nb#11 Nb#11 LP-IG-LIS target
description:
  
  640   Tuesday, August 22, 2023, 09:35 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sintering (second coating on same tube)Tuesday, August 22, 2023, 09:29
The coated container was wrapped
in 4 Ta foil heatshields.
  
  639   Tuesday, August 15, 2023, 12:03 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sinteringTuesday, August 15, 2023, 10:48
The coated container was wrapped
in 4 Ta foil heatshields.
  
  638   Wednesday, June 21, 2023, 10:37 Aaron SchmidtNb45447-7LP-IG-LISIn progressConditioning Nb#10Nb#10 LP-IG-LIS target description:
  
  637   Thursday, June 08, 2023, 09:29 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sintering (new TaC)Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no
ball mill procedure.
  
  636   Tuesday, June 06, 2023, 09:14 Darwin Ortiz RosalesC44139-4TARGET BOATDoneGraphite inside insert Experiment 2 (regular formulation discs)Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields.  Note final
  
  635   Monday, June 05, 2023, 14:52 Aaron Schmidt    Swapped turbo pumps. Previous TP would only spin up to
4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. 
  
  634   Wednesday, May 24, 2023, 15:23 Darwin Ortiz Rosales 44139-4LP TUBEDoneGraphite inside insert Experiment 1 
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with
 Screenshot_Graphite_insert_Exp1.png 
  633   Tuesday, May 02, 2023, 14:20 John Wongnp-TiO2 TARGET BOATIn progressCarbonization of np-TiO2 spun fibrous pellets/fibre matsTuesday, May 02, 2023, 14:03
Two np-TiO2 spun fibrous pellets
and 1 batch of fibre mats were wrapped with
 7x 
  632   Friday, April 28, 2023, 11:31 Darwin Ortiz RosalesTaCBoatTARGET BOATDoneTaC coated endcaps and spring sinteringFriday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs.
  
  631   Friday, April 28, 2023, 09:39 Darwin Ortiz RosalesTiC44692-5LP-FEBIADDoneTiC230425


   
        
            
 MicrosoftTeams-image_(20).png 
  630   Thursday, April 27, 2023, 22:18 John WongTiC44692-5LP-FEBIADIn progressTiC230425


   
        
            
 Screenshot_2023-04-27_204948.jpgScreenshot_2023-04-27_205012.jpgScreenshot_2023-04-27_220239.jpgScreenshot_2023-04-27_220323.jpgScreenshot_2023-04-28_010640.jpg 