  569   Wednesday, March 09, 2022, 06:27 Darwin Ortiz RosalesTaC42464-2HP-FEBIADDoneTaC coating/sintering Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated
  
  568   Tuesday, February 15, 2022, 12:37 Darwin Ortiz RosalesNb TARGET BOATDoneNb annealing for PhillipWednesday, February 09, 2022, 06:55 
Target boat with a layer of
  
  567   Thursday, February 10, 2022, 08:58 Darwin Ortiz RosalesSiC HP-FEBIADDone Thursday, February 10, 2022, 08:52 
Total number of foils: 528 (
  
  566   Wednesday, February 09, 2022, 08:08 Darwin Ortiz RosalesNb TARGET BOATDoneNb annealing for PhillipWednesday, February 09, 2022, 06:55 
Target boat with a layer of
  
  565   Thursday, November 25, 2021, 14:00 Aaron Schmidt    Lower insulator replaced The Helicoil had mostly pulled out
of the old one.
  
  564   Wednesday, November 10, 2021, 18:07 Aaron SchmidtTa44691-11LP-SISIn progressConditioning Ta#63Ta#63 LP-SIS target description: 
  
  563   Monday, November 08, 2021, 09:36 Darwin Ortiz RosalesEndcaps TARGET BOATDoneCoating of Ta caps and Ta springs (8 caps and 2 springs)Monday, November 08, 2021, 09:35
Two groups of 4 caps wrapped in graphite
with graphite discs in between. 
  
  562   Wednesday, November 03, 2021, 09:24 Darwin Ortiz RosalesEmpty44691-10LP-SISDoneTaC coating/sintering Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers)
  
  561   Monday, November 01, 2021, 07:39 Darwin Ortiz RosalesEmpty44508-3LP-SISDoneTaC coating/sintering Monday, November 01, 2021, 07:37
Ta tube was coated with TaC
 211101-TaC_coating.png 
  560   Wednesday, October 27, 2021, 11:09 Darwin Ortiz RosalesTa44691-3LP-SISDoneTaC coating/sintering Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52
  
  559   Monday, October 25, 2021, 11:53 Darwin Ortiz RosalesTaC 42218-4HP-IG-LISDoneTaC coating/sintering Monday, October 25, 2021, 11:52
Ta IGLIS tube was coated with
  
  558   Thursday, October 21, 2021, 09:58 Darwin Ortiz RosalesTaC TARGET BOATDoneCoating of Ta caps and Ta springs (10 caps and 2 springs) 
Thursday, October 21, 2021, 10:02
10 TaC coated Ta caps, wrapped in
  
  557   Wednesday, October 13, 2021, 08:35 Aaron Schmidt   ProblemsTroubleshoot - Pump down issues.Swapped out the Cu gaskets for SS gaskets
in the HS top lines. (x2)
Wednesday, October 13, 2021, 08:35:
  
  556   Tuesday, September 14, 2021, 09:33 Darwin Ortiz Rosales 42218-5LP-IG-LISDoneTaC coating/sinteringTuesday, September 14, 2021, 09:32
Ta IGLIS tube was coated with
  
  555   Wednesday, September 08, 2021, 12:43 Darwin Ortiz Rosales 44139-8-SKTARGET BOATDoneC Conditioning Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto
  
  554   Thursday, September 02, 2021, 07:14 Darwin Ortiz RosalesTaC44691-7LP-SISDoneTaC coating/sintering Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC
 coating44691-7.PNG 
  553   Thursday, August 05, 2021, 11:18 Darwin Ortiz RosalesSiC44691-2LP-SISDoneDr blade and non-Dr blade Material Experiment (sintering)Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm
 image_2021-08-09_221014.png 
  552   Wednesday, July 21, 2021, 16:45 Ferran Boix PamiesEmpty TARGET BOATDoneparasitic target thermal tests v2, foil measurement. 2021-07-21 4:44pm Vacumm at 1e-5Torr.
Water cooling leak check ok.
  
  551   Wednesday, June 23, 2021, 17:48 Aaron SchmidtTa44691-4LP-SISIn progressConditioning Ta#62 (Replacement) Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10)
 Ta#62_conditioning_-_Evap_2_-_44691-4.docx 
  550   Friday, June 11, 2021, 08:41 Darwin Ortiz RosalesNb TARGET BOATDoneNb treatment for Norman Friday, June 11, 2021, 08:05
Target boat with a layer of
  