ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
 |
569
|
Wednesday, March 09, 2022, 06:27 |
Darwin Ortiz Rosales | TaC | 42464-2 | HP-FEBIAD | Done | TaC coating/sintering | Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated |
|
568
|
Tuesday, February 15, 2022, 12:37 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of |
|
567
|
Thursday, February 10, 2022, 08:58 |
Darwin Ortiz Rosales | SiC | | HP-FEBIAD | Done | | Thursday, February 10, 2022, 08:52
Total number of foils: 528 ( |
|
566
|
Wednesday, February 09, 2022, 08:08 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of |
|
565
|
Thursday, November 25, 2021, 14:00 |
Aaron Schmidt | | | | | Lower insulator replaced | The Helicoil had mostly pulled out
of the old one.
|
|
564
|
Wednesday, November 10, 2021, 18:07 |
Aaron Schmidt | Ta | 44691-11 | LP-SIS | In progress | Conditioning Ta#63 | Ta#63 LP-SIS target description:
|
|
563
|
Monday, November 08, 2021, 09:36 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | Coating of Ta caps and Ta springs (8 caps and 2 springs) | Monday, November 08, 2021, 09:35
Two groups of 4 caps wrapped in graphite
with graphite discs in between. |
|
562
|
Wednesday, November 03, 2021, 09:24 |
Darwin Ortiz Rosales | Empty | 44691-10 | LP-SIS | Done | TaC coating/sintering | Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers) |
|
561
|
Monday, November 01, 2021, 07:39 |
Darwin Ortiz Rosales | Empty | 44508-3 | LP-SIS | Done | TaC coating/sintering | Monday, November 01, 2021, 07:37
Ta tube was coated with TaC |
|
560
|
Wednesday, October 27, 2021, 11:09 |
Darwin Ortiz Rosales | Ta | 44691-3 | LP-SIS | Done | TaC coating/sintering | Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52 |
|
559
|
Monday, October 25, 2021, 11:53 |
Darwin Ortiz Rosales | TaC | 42218-4 | HP-IG-LIS | Done | TaC coating/sintering | Monday, October 25, 2021, 11:52
Ta IGLIS tube was coated with |
|
558
|
Thursday, October 21, 2021, 09:58 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | Coating of Ta caps and Ta springs (10 caps and 2 springs) |
Thursday, October 21, 2021, 10:02
10 TaC coated Ta caps, wrapped in |
|
557
|
Wednesday, October 13, 2021, 08:35 |
Aaron Schmidt | | | | Problems | Troubleshoot - Pump down issues. | Swapped out the Cu gaskets for SS gaskets
in the HS top lines. (x2)
Wednesday, October 13, 2021, 08:35: |
|
556
|
Tuesday, September 14, 2021, 09:33 |
Darwin Ortiz Rosales | | 42218-5 | LP-IG-LIS | Done | TaC coating/sintering | Tuesday, September 14, 2021, 09:32
Ta IGLIS tube was coated with |
|
555
|
Wednesday, September 08, 2021, 12:43 |
Darwin Ortiz Rosales | | 44139-8-SK | TARGET BOAT | Done | C Conditioning | Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto |
|
554
|
Thursday, September 02, 2021, 07:14 |
Darwin Ortiz Rosales | TaC | 44691-7 | LP-SIS | Done | TaC coating/sintering | Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC |
|
553
|
Thursday, August 05, 2021, 11:18 |
Darwin Ortiz Rosales | SiC | 44691-2 | LP-SIS | Done | Dr blade and non-Dr blade Material Experiment (sintering) | Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm |
|
552
|
Wednesday, July 21, 2021, 16:45 |
Ferran Boix Pamies | Empty | | TARGET BOAT | Done | parasitic target thermal tests v2, foil measurement. | 2021-07-21 4:44pm Vacumm at 1e-5Torr.
Water cooling leak check ok.
|
|
551
|
Wednesday, June 23, 2021, 17:48 |
Aaron Schmidt | Ta | 44691-4 | LP-SIS | In progress | Conditioning Ta#62 (Replacement) | Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10) |
|
550
|
Friday, June 11, 2021, 08:41 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb treatment for Norman | Friday, June 11, 2021, 08:05
Target boat with a layer of |
|
|