601
|
Thursday, November 10, 2022, 07:40 |
Darwin Ortiz Rosales | TaC | 45220-13 | LP-SIS | Done | TaC coating sintering | Thursday, November 10, 2022, 07:40
The coated container was wrapped
in four Ta foil heatshields. |
|
600
|
Monday, November 07, 2022, 14:26 |
Darwin Ortiz Rosales | TaC | 44139-4 | TARGET BOAT | Done | TaC coating sintering | Monday, November 07, 2022, 14:24
The coated container tube was wrapped
in four Ta foil heatshields. |
|
599
|
Tuesday, November 01, 2022, 17:35 |
John Wong | TiC | | TARGET BOAT | Done | Np-TiC fibres systhesis | Tuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were
produced using the e-spinner. Each |
|
598
|
Friday, October 28, 2022, 07:59 |
Darwin Ortiz Rosales | TaC | 45220-6 | LP-SIS | Done | TaC coating sintering | Friday, October 28, 2022, 07:58
The coated container was wrapped
in four Ta foil heatshields. |
|
597
|
Tuesday, October 25, 2022, 12:25 |
Darwin Ortiz Rosales | TaC | 44139-15-SK | LP-SIS | Done | TaC coating sintering | Tuesday, October 25, 2022, 12:18
Container wrapped in 4 Ta foil heatshields
Target temperature on OMEGA= 1850-1900 |
|
596
|
Wednesday, October 19, 2022, 09:50 |
John Wong | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC |
|
   |
595
|
Tuesday, October 18, 2022, 13:59 |
Hannah Toy | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC | Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2 |
|
594
|
Monday, October 17, 2022, 11:32 |
Darwin Ortiz Rosales | TaC | 45220-2 | LP-SIS | Done | TaC coating sintering | Monday, October 17, 2022, 10:03
The coated container was wrapped
in 4 Ta foil heatshields. |
|
593
|
Thursday, September 29, 2022, 10:02 |
Darwin Ortiz Rosales | | 44139-3 | TARGET BOAT | Done | 220926-Graphite conditioning in target tube | Thursday, September 29, 2022, 09:57
A Ta container tube was wrapped with
3 Ta heatshields. |
|
592
|
Thursday, September 22, 2022, 07:15 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Thursday, September 22, 2022, 07:13
Each endcap is separated with |
|
591
|
Wednesday, September 14, 2022, 11:48 |
Darwin Ortiz Rosales | | | TARGET BOAT | Done | Grahite disc conditioning 220907G | Wednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with
3 Ta heatshields. |
|
590
|
Thursday, September 01, 2022, 12:32 |
Darwin Ortiz Rosales | TaC | 44691-13 | LP-SIS | Done | TaC coating sintering | Thursday, September 01, 2022, 10:34
The coated container was wrapped
in three Ta foil heatshields. |
|
589
|
Thursday, August 25, 2022, 10:16 |
Darwin Ortiz Rosales | TiC | 44692-10 | HP-FEBIAD | Done | TiC 220818 Sintering (TiC #6) | Thursday, August 25, 2022, 10:06
Target container is loaded with 379 |
|
588
|
Wednesday, August 10, 2022, 09:31 |
Ivan Bao | Empty | | TARGET BOAT | In progress | TC tests | 1st test polarity 1
10:12 am Begin pumping down to rough
vacuum |
|
587
|
Thursday, August 04, 2022, 09:31 |
Ferran Boix Pamies | Empty | | TARGET BOAT | In progress | TC on Ta boat test. | 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31 |
|
586
|
Wednesday, June 29, 2022, 10:12 |
Darwin Ortiz Rosales | TaC | 44692-10 | HP-FEBIAD | Done | TaC coating sintering | Wednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated |
|
585
|
Tuesday, June 28, 2022, 09:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | In progress | TC test on Ta tube | Tuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night. |
|
584
|
Tuesday, June 21, 2022, 09:48 |
Darwin Ortiz Rosales | SiC | 37978-1 | HP-FEBIAD | Done | T-220617 sintering | Tuesday, June 21, 2022, 09:43
Total number of foils: |
|
583
|
Monday, June 20, 2022, 14:52 |
Darwin Ortiz Rosales | Empty | | | Done | softstart of new TP | Monday, June 20, 2022, 14:50
A new Turbo pump was installed this
morning and it was soft started. It |
|
582
|
Tuesday, June 14, 2022, 09:04 |
Darwin Ortiz Rosales | Ta | 37978-1 | HP-FEBIAD | Done | TaC coating sintering | Tuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated |
|
|