|
ID |
Date |
Author |
Type |
Category |
Subject |
Text |
|
|
55
|
Mon Sep 24 07:16:18 2012 |
Jessica Tomlinson | Other | Other | Analysis update | Energy vs Time plots
I updated |
|
|
59
|
Tue Dec 4 05:40:10 2012 |
Jessica Tomlinson | Other | Other | analysis - single strip E vs t | I have attached some single strip
energy vs time plots to show that the structure
seen in the collective E vs t plots is in |
6x |
|
1
|
Mon Apr 4 01:34:54 2011 |
Jamie Brown | Routine | General | Proposal | See attached. |
|
|
31
|
Mon May 23 09:59:23 2011 |
Mike Bentley | Routine | General | End/Dtart of Run Summary (BRF/MAB) | Ran all night OK, currently 14epA, H2 stable,
DAQ stable
ISSUES: |
|
|
32
|
Mon May 23 15:58:30 2011 |
Mike Bentley | Routine | General | End of Shift summary | OK - summary of events during this
shift.
|
|
|
34
|
Tue May 24 01:16:37 2011 |
Tom Davinson | Routine | General | Re: End of Shift summary |
1.TDCs. We have been sorting offline, and
we have now established that between run |
|
|
36
|
Tue May 24 08:18:23 2011 |
Mike Bentley | Routine | General | end of shift summary | We have been running smoothly all
night. Only problem is that the DAQ occasionally
does not start properly after a stop-go. |
|
|
37
|
Tue May 24 20:45:12 2011 |
Mike Bentley | Other | General | Update for during the day 24th May, wednesday | Update:
W decided at 8.00 to stop, check
the tune, retune and get back going. This |
|
|
38
|
Tue May 24 23:59:16 2011 |
Jennifer Fallis, Lars Martin | Routine | General | Shift summary | Buncher problem was resolved around 22:00
(driver module needed to be replaced).
Checked current on FC0 and trigger rate, |
|
|
39
|
Wed May 25 03:15:44 2011 |
Brian | Routine | General | Start of run summary and TDC problems | Summary at start of run
Read through the runbook and end
of run summar and the situation appears to |
|
|
40
|
Wed May 25 07:09:17 2011 |
Brian | Routine | General | End of run summary (yes, a bit early, but done all I can think of!) | Running status
Everything seems to be running OK.
ADC and TDC spectra look OK. Chamber |
|
|
41
|
Wed May 25 18:05:55 2011 |
Mike Bentley | Routine | General | Report on day shift and changed energy - now at 3.98 MeV/u | All ran smoothly.
As a test, ran for a short period
at 1200 midday to run without S2-2 in the |
|
|
44
|
Thu May 26 02:54:10 2011 |
Derek and Naomi | Routine | General | Thu 0-8am shift summary |
For run 123:
Beam outage for ~15 min but not stopping |
|
|
46
|
Thu May 26 23:46:40 2011 |
Sarah and Brian | Routine | General | Thu 16:00-00:00 summary | Run139
Started 19:05:03 |
|
|
47
|
Thu May 26 23:57:34 2011 |
Derek | Routine | General | Friday 00:00 - 08:00 Summary | Sarah informed me that Jamie was performing
the sorting and saving of spectra differently
and didn't know what exactly to do so I will |
|
|
49
|
Fri May 27 23:13:01 2011 |
Alex Rojas | Routine | General | Shift summary | No major problems presented, A pluser walk
was performed at the begining of the shift
run161 S2-1 front, run162 S2-2 front, run163 |
|
|
50
|
Sat May 28 07:46:09 2011 |
Lars Martin | Routine | General | | Beam current dropped to 85 epA at the start
of the shift, operator checked for reasons
and decided to change
|
|
|
54
|
Wed Jul 18 08:29:03 2012 |
Jessica Tomlinson | Other | General | Analysis update | Energy calibration for S2-2 was done
using the pulser data (set 6 of the pulser
runs) to calculate the offsets and alpha |
|
|
57
|
Fri Nov 16 07:12:32 2012 |
Jessica Tomlinson | Other | General | 4.11 MeV/u analysis | I have sorted the 4.11MeV/u data runs (the
ones which had the common stop mode on the
TDCs) and applied the following cuts: |
6x |
|
58
|
Fri Nov 16 07:23:26 2012 |
Jessica Tomlinson | Other | General | S2-1 plot that would fit on previous elog | Attachment 1 shows S2-1 energy vs
time with a gate on energy in S2-2 being
greater than 9MeV i.e. See previous elog |
|
|
60
|
Fri Jan 11 06:56:01 2013 |
Jessica Tomlinson | Other | General | multiplicities, hit patterns and good hits in an event | I have attached a pdf of a series of slides
with some multiplicity and hit pattern plots
on, also a list of cuts. As well as this |
|
|
61
|
Fri Jan 11 09:48:58 2013 |
Tom Davinson | Other | General | Re: multiplicities, hit patterns and good hits in an event |
|
|
|
2
|
Sat Apr 9 11:35:14 2011 |
Tom Davinson | | | TUDA configuration & setup |
Nominal detector configuration for S1287
is as follows:
|
|
|
3
|
Sat Apr 9 14:57:30 2011 |
Tom Davinson | | | MIDAS DAQ configuration |
tuda2 (by TUDA chamber, SEBT1) was powered
off on arrival
|
11x |
|
4
|
Mon Apr 11 14:57:08 2011 |
Tom Davinson | | | SEBT1 & HERACLES wipe tests |
Work permit (2011-4-11-3) was requested to
vent SEBT1 upstream of TUDA chamber
|
|
|
5
|
Mon Apr 11 18:39:17 2011 |
Tom Davinson | | | Monday 11 April |
TUDA was successfully re-installed on SEBT1
by LB, TD, AML and PM.
|
|
|
6
|
Tue Apr 12 11:21:38 2011 |
Tom Davinson | | | Tuesday 12 April | The TUDA @ ISAC-II grounding test was successfully
completed this am
per work permit 2011-04-12-2.
|
|
|
7
|
Wed Apr 13 03:43:42 2011 |
Jamie | | | Ni window leak tests 1 | 2um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and |
|
|
8
|
Wed Apr 13 03:55:21 2011 |
Jamie | | | Safety Report | attached
note. s2 position in fig. 1 is wrong, |
|
|
9
|
Wed Apr 13 09:37:51 2011 |
Tom Davinson | | | Wednesday 13 April |
09.20 TUDA2.PNG5 1.04E-06Torr
See attachments 1 & 2 for EPICS log |
|
|
10
|
Thu Apr 14 10:06:34 2011 |
Tom Davinson | | | Thursday 14 April |
10.02 See attachment 1 for overnight EPICS
log of TUDA2.CG5
|
|
|
11
|
Fri Apr 15 11:00:17 2011 |
Tom Davinson | | | Friday 15 April | 11.15 See attachment 1 for overnight EPICS
log of TUDA2.CG5
Downstream flange *not* secured by |
|
|
12
|
Sat Apr 16 09:31:56 2011 |
Tom Davinson | | | Saturday 16 April | Continuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
|
|
|
13
|
Sun Apr 17 09:47:04 2011 |
Tom Davinson | | | Sunday 17 April | Continuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
|
|
|
14
|
Thu May 5 11:31:13 2011 |
JB | | | Tom's ToDo List |
|
|
|
15
|
Fri May 6 06:03:00 2011 |
Tom Davinson | | | Sort programs, spectra titles & calibration procedure | A summary of online sort programs can be found
at:
|
|
|
16
|
Fri May 6 15:08:00 2011 |
JB | | | New TUDA EPICS layout | |
|
|
17
|
Sat May 7 17:29:13 2011 |
JB | | | Window leak tests on TUDA | Attached plot shows rate of pressure increase
in ~2l volume upstream of TUDA with Ni window
#2 installed on reentrant flange. Comparison |
|
|
18
|
Wed May 11 17:59:12 2011 |
JB | | | Re-entrant flange alignment | Alignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way). |
|
|
19
|
Thu May 12 03:04:44 2011 |
Tom Davinson | | | Re: Re-entrant flange alignment | > Alignments checks revealed that downstream
end of
> TUDA was ~1mm off (can't remember which |
|
|
20
|
Sun May 15 13:07:12 2011 |
JB | | | W detector V-I curve | York W detector 2635-19
1037um |
|
|
21
|
Mon May 16 21:14:19 2011 |
Jamie Brown | | | Broken solder on PD2 | As you can see... |
|
|
22
|
Tue May 17 12:32:13 2011 |
Jamie Brown | | | Thick carbon target | The thick carbon target, to be used for
background runs for the thick CH2 measurement
was supplied by Marek. |
|
|
23
|
Wed May 18 08:54:08 2011 |
Alex Murphy | | | Photodiode data from target thickness measurements | In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements. |
|
|
24
|
Wed May 18 08:58:53 2011 |
Alex Murphy | | | Foil energy losses | I've analysed
data from runs 4 to 12, which were the alpha |
|
|
25
|
Wed May 18 09:09:02 2011 |
Alison Laird | | | Status update | Wednesday morning:
4 new windows were tested last night.
2 very good. |
|
|
26
|
Fri May 20 05:47:08 2011 |
Tom Davinson | | | 3.25MeV/u 21Ne(5+) | |
|
|
27
|
Sat May 21 18:25:36 2011 |
Jamie Brown | | | Beam spot | |
|
|
28
|
Sun May 22 11:45:03 2011 |
Tom Davinson | | | 4.11MeV/u 21Ne(5+) | |
|
|
29
|
Mon May 23 02:12:14 2011 |
Brian | Routine | | Start of Run summary | Handover from last shift was...
1. Running at 4.11 MeV/u at about
15enA (5+) |
|
|
30
|
Mon May 23 02:16:32 2011 |
Jamie Brown | | | End of run summary | Plan for shift was to increase trigger
thresholds on S2-1 and S2-2 to cut out the
low energy "stuff" which is dominating |
|
|
33
|
Tue May 24 00:01:03 2011 |
Oliver and Hicham | Routine | | end of shift summary | Things have been running smoothly from
4 pm to midnight.
Reading in FC0 = 120-130 epA |
|
|
35
|
Tue May 24 01:47:17 2011 |
Anonymous | | | Shift schedule, as of 1am Tuesday 24th | |
|
|
42
|
Wed May 25 22:45:42 2011 |
Jamie Brown | | | Leakage current in S2-1 | At approximately 7pm, noted that trigger
rate in S2-1 had dropped by factor of ~20.
Detector had tripped off due to leakage current |
|
|
43
|
Thu May 26 00:15:18 2011 |
Hicham and Sarah | Routine | | End of run summary | still running at 3.98 MeV/u
19:08
S2-1 had tripped off due to leakge |
|
|
45
|
Thu May 26 12:53:48 2011 |
Jamie Brown | | | H2 fill and vent procedures | Please note that these procedures are not
perfect and other small operations not listed
may need to be carried out. Some mistakes |
|
|
48
|
Fri May 27 14:24:00 2011 |
Tom Davinson | | | S1287 data transfer |
S1287 data files R1_*.gz to R100_*.gz transferred
from directory
|
|
|
51
|
Sat May 28 10:07:44 2011 |
Jamie Brown, and Mike Bentley | | | Plan for last day | 1) PD run with gas (250Torr) - done
2) Pump down to 50 Torr - done
3) PD run - done |
|
|
52
|
Mon Jun 20 05:58:21 2011 |
Jamie Brown | | | Run log | Attached is a spreadsheet summarizing all
the run information from the experiment. |
|
|
53
|
Tue Jun 21 02:58:31 2011 |
Jamie Brown | | | Run Books 13 and 14 | Attached. Book 13 is split into 4 sections
as otherwise the file is too big for the
elog to accept. |
|
|
62
|
Wed Feb 4 17:27:55 2015 |
Anonymous | | | | This is reachable and change-able via outside
Internet |
|