Nominal detector configuration for S1287 is as follows:
Detector Tgt Ladder #2
-Detector Nominal LAB Solid
Distance (cm) Angles (deg) Angle (sr)
S2-1 7.0 9.5-26.4 0.430
S2-2 28.0 2.4-7.1 0.032
W >35.0 0.0-4.1 ~0.020
S2-1 MSL type S2(DS)-500
S2-2 MSL type S2(DS)-500
W MSL type W(DS)-1000
Hardware installed in TUDA chamber is as follows (listing from
upstream to downstream):
1 Upstream support collar
2 PDs (to monitor Ni window)
PD preamplifier assembly
3 4mm dia collimator
CCTV camera?
Target Ladder - Position #1 - 83cm from inner surface of the downstream flange
5mm dia anti-scatter collimator
PDs (to monitor 197Au RBS)
Target Ladder - Position #2 - 75cm from inner surface of the downstream flange
10mm & 3mm dia tuning apertures, ZnS, PDs, (CH2)n targets
4 S2-1 DSSSD
S2 preamplifier assembly
5 S2-2 DSSSD
S2 preamplifier
6 W DSSSD
W preamplifier assembly (to be shipped to TRIUMF)
7 Faraday Cup
8 Downstream 4-vane monitor (not used)
Detector mounts will be within +/-5mm of their nominal positions. |