Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1287  ELOG logo
Message ID: 36     Entry time: Tue May 24 08:18:23 2011
Author: Mike Bentley 
Type: Routine 
Category: General 
Subject: end of shift summary 

 We have been running smoothly all night. Only problem is that the DAQ occasionally does not start properly after a stop-go. The dead-time goes to nearly 100%. This happened twice in the night,. and a second stop-go did the trick. Needs looking at.

 

We are going to stop now and (a) check the tune properly and (b) retune if necessary and then carry on the same energy. There is not really evidence in the data of the structure we are looking for, so we need to carry on at this energy for a while. This process will take 6 hours or so

 

MAB

ELOG V2.9.2-2455