still running at 3.98 MeV/u
19:08
S2-1 had tripped off due to leakge current going above 8uA
Camera watching leakages had also frozen so didn't realize until we checked downstairs
asked to lower beam intensity down to 55epA (was 120epA) @ run119
23:22
asked to set beam intensity to 100epA
upper limit of leakage set to 20uA
S2-1 leakage current ~9.93uA
Sorted Runs:
run120
run121 still running
|