Version 2 of ...
- re-test chamber/coolant loop with vacuum cycle - done
- install MSL Type W preamp - done
- to adjust position of support ring, temporarily loosen grub
screws of *all* support rings - secure *all* grub screws
when finished
- use 9/16" spanner and adjustable wrench for mechanical support
for Swagelok connectors - done
- test for gross leaks at air - done
- test preamp with pulser - done
- re-test coolant loop with vacuum cycle - done
- move linear translator from position #3 to #1 - done
- align target ladders & re-entrant flange window
- select appropriate collimator (TUDA chamber entrance flange)
- install & test Faraday cup
- Ortec 439 or EPICS readout
for the former, scaler readout is setup
for the latter, startup EPICS TUDA diagnostics
- install & test CCTV camera to view ZnS scintillator
- remember we will replace viewport with H2 feedthrough
- TV monitor in ISAC Control Room
- connect via cable #2
- use cable #1 for Keithley 610C Electrometer
- mark screen with position of 3mm dia. tuning aperture
- install additional thermocouple to monitor ambient gas temperature?
- TUDA S Cupboard ISAC-I for thermocouple & switch
- install & test re-entrant flange windows with He
- assumes bypass has been installed
- install detectors
- measure actual positions of detectors
- alpha & pulser calibration
- install detector shields for *all* detectors for beam tuning
- tune all required beam energies up front
- grab screenshots of each tune from ISAC Ops log to obtain
exact beam energy from ToF diagnostic
- remove detector shields
- RF delay timing (with beam)