Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1287  ELOG logo
Message ID: 51     Entry time: Sat May 28 10:07:44 2011
Author: Jamie Brown, and Mike Bentley 
Type:  
Category:  
Subject: Plan for last day 

1) PD run with gas (250Torr) - done

2) Pump down to 50 Torr - done

3) PD run - done

4) Take data (PD out) at 50Torr ~2 hrs. ~110epA - done

5) Pump out - done

6) PD run (no gas) - done

   a) remove 5mm collimator and run without gas, ~100epA (no PD) - done

7) Complete H2 venting process - done

8) Open up, sources in (window off) - done

9) Pump down - done

10) alpha data (some of the S2-1 inner strips look  very ill indeed , but all but one or two show clear triple-alpha peaks.  - done

11) pulser walkthrough - done

12) vent and open up - done

13) dismount detectors and re-entrant flange - done

14) pub!

Done - finished at 7.30pm, pitcher of ale methinks. 

ELOG V2.9.2-2455