1) PD run with gas (250Torr) - done
2) Pump down to 50 Torr - done
3) PD run - done
4) Take data (PD out) at 50Torr ~2 hrs. ~110epA - done
5) Pump out - done
6) PD run (no gas) - done
a) remove 5mm collimator and run without gas, ~100epA (no PD) - done
7) Complete H2 venting process - done
8) Open up, sources in (window off) - done
9) Pump down - done
10) alpha data (some of the S2-1 inner strips look very ill indeed , but all but one or two show clear triple-alpha peaks. - done
11) pulser walkthrough - done
12) vent and open up - done
13) dismount detectors and re-entrant flange - done
14) pub!
Done - finished at 7.30pm, pitcher of ale methinks. |