| ID | 
Date | 
Author | 
Type | 
Category | 
Subject | 
Text | 
  | 
| 
  62  
 | 
Wed Feb  4 17:27:55 2015 | 
Anonymous |   |   |   | This is reachable and change-able via outside 
Internet | 
   | 
| 
  61  
 | 
Fri Jan 11 09:48:58 2013 | 
Tom Davinson | Other | General | Re: multiplicities, hit patterns and good hits in an event | 
 
 | 
   | 
| 
  60  
 | 
Fri Jan 11 06:56:01 2013 | 
Jessica Tomlinson | Other | General | multiplicities, hit patterns and good hits in an event | I have attached a pdf of a series of slides 
with some multiplicity and hit pattern plots 
on, also a list of cuts. As well as this | 
    | 
| 
  59  
 | 
Tue Dec  4 05:40:10 2012 | 
Jessica Tomlinson | Other | Other | analysis - single strip E vs t  |  I have attached some single strip 
energy vs time plots to show that the structure 
seen in the collective E vs t plots is in | 
 6x   | 
| 
  58  
 | 
Fri Nov 16 07:23:26 2012 | 
Jessica Tomlinson | Other | General | S2-1 plot that would fit on previous elog |  Attachment 1 shows S2-1 energy vs 
time with a gate on energy in S2-2 being 
greater than 9MeV i.e. See previous elog | 
    | 
| 
  57  
 | 
Fri Nov 16 07:12:32 2012 | 
Jessica Tomlinson | Other | General | 4.11 MeV/u analysis | I have sorted the 4.11MeV/u data runs (the 
ones which had the common stop mode on the 
TDCs) and applied the following cuts: | 
 6x   | 
| 
  55  
 | 
Mon Sep 24 07:16:18 2012 | 
Jessica Tomlinson | Other | Other | Analysis update |  Energy vs Time plots
 
 
I updated | 
       | 
| 
  54  
 | 
Wed Jul 18 08:29:03 2012 | 
Jessica Tomlinson | Other | General | Analysis update |  Energy calibration for S2-2 was done 
using the pulser data (set 6 of the pulser 
runs) to calculate the offsets and alpha | 
   | 
| 
  53  
 | 
Tue Jun 21 02:58:31 2011 | 
Jamie Brown |   |   | Run Books 13 and 14 | Attached. Book 13 is split into 4 sections 
as otherwise the file is too big for the 
elog to accept. | 
        | 
| 
  52  
 | 
Mon Jun 20 05:58:21 2011 | 
Jamie Brown |   |   | Run log | Attached is a spreadsheet summarizing all 
the run information from the experiment. | 
    | 
| 
  51  
 | 
Sat May 28 10:07:44 2011 | 
Jamie Brown, and Mike Bentley |   |   | Plan for last day | 1) PD run with gas (250Torr) - done
 
2) Pump down to 50 Torr - done
 
3) PD run - done | 
   | 
| 
  50  
 | 
Sat May 28 07:46:09 2011 | 
Lars Martin | Routine | General |   | Beam current dropped to 85 epA at the start 
of the shift, operator checked for reasons 
and decided to change
 | 
   | 
| 
  49  
 | 
Fri May 27 23:13:01 2011 | 
Alex Rojas | Routine | General | Shift summary | No major problems presented, A pluser walk 
was performed at the begining of the shift 
run161 S2-1 front, run162 S2-2 front, run163 | 
   | 
| 
  48  
 | 
Fri May 27 14:24:00 2011 | 
Tom Davinson |   |   | S1287 data transfer | 
 
S1287 data files R1_*.gz to R100_*.gz transferred 
from directory
 | 
   | 
| 
  47  
 | 
Thu May 26 23:57:34 2011 | 
Derek | Routine | General | Friday 00:00 - 08:00 Summary | Sarah informed me that Jamie was performing 
the sorting and saving of spectra differently 
and didn't know what exactly to do so I will | 
   | 
| 
  46  
 | 
Thu May 26 23:46:40 2011 | 
Sarah and Brian | Routine | General | Thu 16:00-00:00 summary | Run139
 
 
Started 19:05:03 | 
   | 
| 
  45  
 | 
Thu May 26 12:53:48 2011 | 
Jamie Brown |   |   | H2 fill and vent procedures | Please note that these procedures are not 
perfect and other small operations not listed 
may need to be carried out. Some mistakes | 
     | 
| 
  44  
 | 
Thu May 26 02:54:10 2011 | 
Derek and Naomi | Routine | General | Thu 0-8am shift summary |  
 
For run 123:
 
Beam outage for ~15 min but not stopping | 
   | 
| 
  43  
 | 
Thu May 26 00:15:18 2011 | 
Hicham and Sarah | Routine |   | End of run summary | still running at 3.98 MeV/u
 
19:08
 
S2-1 had tripped off due to leakge | 
   | 
| 
  42  
 | 
Wed May 25 22:45:42 2011 | 
Jamie Brown |   |   | Leakage current in S2-1 | At approximately 7pm, noted that trigger 
rate in S2-1 had dropped by factor of ~20. 
Detector had tripped off due to leakage current | 
   | 
| 
  41  
 | 
Wed May 25 18:05:55 2011 | 
Mike Bentley | Routine | General | Report on day shift and changed energy - now at 3.98 MeV/u |  All ran smoothly.
 
As a test, ran for a short period 
at 1200 midday to run without S2-2 in the | 
    | 
| 
  40  
 | 
Wed May 25 07:09:17 2011 | 
Brian | Routine | General | End of run summary (yes, a bit early, but done all I can think of!) | Running status
 
Everything seems to be running OK.  
ADC and TDC spectra look OK.  Chamber | 
   | 
| 
  39  
 | 
Wed May 25 03:15:44 2011 | 
Brian | Routine | General | Start of run summary and TDC problems | Summary at start of run
 
Read through the runbook and end 
of run summar and the situation appears to | 
   | 
| 
  38  
 | 
Tue May 24 23:59:16 2011 | 
Jennifer Fallis, Lars Martin | Routine | General | Shift summary | Buncher problem was resolved around 22:00 
(driver module needed to be replaced).
 
Checked current on FC0 and trigger rate, | 
   | 
| 
  37  
 | 
Tue May 24 20:45:12 2011 | 
Mike Bentley | Other | General | Update for during the day 24th May, wednesday |  Update: 
 
W decided at 8.00 to stop, check 
the tune, retune and get back going. This | 
     | 
| 
  36  
 | 
Tue May 24 08:18:23 2011 | 
Mike Bentley | Routine | General | end of shift summary |  We have been running smoothly all 
night. Only problem is that the DAQ occasionally 
does not start properly after a stop-go. | 
   | 
| 
  35  
 | 
Tue May 24 01:47:17 2011 | 
Anonymous |   |   | Shift schedule, as of 1am Tuesday 24th |   | 
    | 
| 
  34  
 | 
Tue May 24 01:16:37 2011 | 
Tom Davinson | Routine | General | Re: End of Shift summary | 
 
1.TDCs. We have been sorting offline, and 
we have now established that between run | 
   | 
| 
  33  
 | 
Tue May 24 00:01:03 2011 | 
Oliver and Hicham | Routine |   | end of shift summary | Things have been running smoothly from 
4 pm to midnight.
 
Reading in FC0 = 120-130 epA | 
   | 
| 
  32  
 | 
Mon May 23 15:58:30 2011 | 
Mike Bentley | Routine | General | End of Shift summary |  OK - summary of events during this 
shift.
 
  | 
   | 
| 
  31  
 | 
Mon May 23 09:59:23 2011 | 
Mike Bentley | Routine | General | End/Dtart of Run Summary (BRF/MAB) | Ran all night OK, currently 14epA, H2 stable, 
DAQ stable
 
ISSUES: | 
   | 
| 
  30  
 | 
Mon May 23 02:16:32 2011 | 
Jamie Brown |   |   | End of run summary | Plan for shift was to increase trigger 
thresholds on S2-1 and S2-2 to cut out the 
low energy "stuff" which is dominating | 
   | 
| 
  29  
 | 
Mon May 23 02:12:14 2011 | 
Brian | Routine |   | Start of Run summary | Handover from last shift was...
 
1. Running at 4.11 MeV/u at about 
15enA (5+) | 
   | 
| 
  28  
 | 
Sun May 22 11:45:03 2011 | 
Tom Davinson |   |   | 4.11MeV/u 21Ne(5+) |   | 
    | 
| 
  27  
 | 
Sat May 21 18:25:36 2011 | 
Jamie Brown |   |   | Beam spot |   | 
    | 
| 
  26  
 | 
Fri May 20 05:47:08 2011 | 
Tom Davinson |   |   | 3.25MeV/u 21Ne(5+) |   | 
    | 
| 
  25  
 | 
Wed May 18 09:09:02 2011 | 
Alison Laird |   |   | Status update |  Wednesday morning:
 
4 new windows were tested last night. 
2 very good. | 
   | 
| 
  24  
 | 
Wed May 18 08:58:53 2011 | 
Alex Murphy |   |   | Foil energy losses | I've analysed 
data from runs 4 to 12, which were the alpha | 
   | 
| 
  23  
 | 
Wed May 18 08:54:08 2011 | 
Alex Murphy |   |   | Photodiode data from target thickness measurements |  In attachment are the peak position 
in the photodiodes (with high gain setting) 
for the target thickness measurements. | 
    | 
| 
  22  
 | 
Tue May 17 12:32:13 2011 | 
Jamie Brown |   |   | Thick carbon target | The thick carbon target, to be used for 
background runs for the thick CH2 measurement 
was supplied by Marek. | 
   | 
| 
  21  
 | 
Mon May 16 21:14:19 2011 | 
Jamie Brown |   |   | Broken solder on PD2 | As you can see... | 
    | 
| 
  20  
 | 
Sun May 15 13:07:12 2011 | 
JB |   |   | W detector V-I curve | York W detector 2635-19
 
1037um | 
    | 
| 
  19  
 | 
Thu May 12 03:04:44 2011 | 
Tom Davinson |   |   | Re: Re-entrant flange alignment | > Alignments checks revealed that downstream 
end of
 
> TUDA was ~1mm off (can't remember which | 
   | 
| 
  18  
 | 
Wed May 11 17:59:12 2011 | 
JB |   |   | Re-entrant flange alignment | Alignments checks revealed that downstream 
end of TUDA was ~1mm off (can't remember 
which way). | 
   | 
| 
  17  
 | 
Sat May  7 17:29:13 2011 | 
JB |   |   | Window leak tests on TUDA | Attached plot shows rate of pressure increase 
in ~2l volume upstream of TUDA with Ni window 
#2 installed on reentrant flange. Comparison | 
    | 
| 
  16  
 | 
Fri May  6 15:08:00 2011 | 
JB |   |   | New TUDA EPICS layout |   | 
    | 
| 
  15  
 | 
Fri May  6 06:03:00 2011 | 
Tom Davinson |   |   | Sort programs, spectra titles  & calibration procedure | A summary of online sort programs can be found 
at:
 
 | 
   | 
| 
  14  
 | 
Thu May  5 11:31:13 2011 | 
JB |   |   | Tom's ToDo List |  
 
 
 | 
   | 
| 
  13  
 | 
Sun Apr 17 09:47:04 2011 | 
Tom Davinson |   |   | Sunday 17 April | Continuation of yesterday's test with c. 300mBar 
of He
 
in the TUDA chamber.
 | 
    | 
| 
  12  
 | 
Sat Apr 16 09:31:56 2011 | 
Tom Davinson |   |   | Saturday 16 April | Continuation of yesterday's test with c. 300mBar 
of He
 
in the TUDA chamber.
 | 
   | 
| 
  11  
 | 
Fri Apr 15 11:00:17 2011 | 
Tom Davinson |   |   | Friday 15 April | 11.15 See attachment 1 for overnight EPICS 
log of TUDA2.CG5
 
      Downstream flange *not* secured by | 
     | 
| 
  10  
 | 
Thu Apr 14 10:06:34 2011 | 
Tom Davinson |   |   | Thursday 14 April | 
 
10.02 See attachment 1 for overnight EPICS 
log of TUDA2.CG5
 | 
     | 
| 
  9  
 | 
Wed Apr 13 09:37:51 2011 | 
Tom Davinson |   |   | Wednesday 13 April | 
 
09.20 TUDA2.PNG5 1.04E-06Torr
 
      See attachments 1 & 2 for EPICS log | 
      | 
| 
  8  
 | 
Wed Apr 13 03:55:21 2011 | 
Jamie |   |   | Safety Report | attached
 
 
 
note. s2 position in fig. 1 is wrong, | 
     | 
| 
  7  
 | 
Wed Apr 13 03:43:42 2011 | 
Jamie |   |   | Ni window leak tests 1 | 2um x 8 mm Ni windows leaked tested on 
TUDA gas cell. With window placed on the 
outside of the cell, cell was evacuated and | 
     | 
| 
  6  
 | 
Tue Apr 12 11:21:38 2011 | 
Tom Davinson |   |   | Tuesday 12 April  | The TUDA @ ISAC-II grounding test was successfully 
completed this am
 
per work permit 2011-04-12-2.
 | 
    | 
| 
  5  
 | 
Mon Apr 11 18:39:17 2011 | 
Tom Davinson |   |   | Monday 11 April | 
 
TUDA was successfully re-installed on SEBT1 
by LB, TD, AML and PM.
 | 
      | 
| 
  4  
 | 
Mon Apr 11 14:57:08 2011 | 
Tom Davinson |   |   | SEBT1 & HERACLES wipe tests | 
 
Work permit (2011-4-11-3) was requested to 
vent SEBT1 upstream of TUDA chamber
 | 
   | 
| 
  3  
 | 
Sat Apr  9 14:57:30 2011 | 
Tom Davinson |   |   | MIDAS DAQ configuration | 
 
tuda2 (by TUDA chamber, SEBT1) was powered 
off on arrival
 | 
 11x   | 
| 
  2  
 | 
Sat Apr  9 11:35:14 2011 | 
Tom Davinson |   |   | TUDA configuration & setup | 
 
Nominal detector configuration for S1287 
is as follows:
 | 
    | 
| 
  1  
 | 
Mon Apr  4 01:34:54 2011 | 
Jamie Brown | Routine | General | Proposal | See attached. | 
    |