  Test-Stand, Page 6 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  781   Thursday, January 30, 2020, 15:25 Aaron SchmidtC(#1)LP-SIS  43044-843515-3In progressConditioning C(#1) HSWas for UC# 32* - Schedule change, now
for C#1
Thursday, January 30, 2020, 15:13:
 C#1_-_Short.docx 
  782   Friday, February 07, 2020, 14:02 Aaron SchmidtC#(1)LP-SIS  43044-843515-3In progressConditioning C#(1) HSWas for UC# 32* - Schedule change, now
for C#1* - Last HS conditioning revealed
a TGHT to HS lid short. Milled the lid back
 C#1_-_2.docx 
  794   Wednesday, June 10, 2020, 08:23 Aaron SchmidtC#1LP-SISITWTM243044-843515-3In progressConditioning C#1Salts: 
Li - 10 uL
Na - 10 uL
 7x 
  800   Monday, July 13, 2020, 14:52 Aaron Schmidt LP-FEBIAD  41790-943515-2 UCx HS conditioning. Broken LP-FEBIAD used to out gas.
Monday, July 13, 2020, 14:52: Roughing.
Monday, July 13, 2020, 15:29: Turbo
  
  814   Wednesday, September 30, 2020, 06:23 Aaron SchmidtC#2LP-SISITWTM244139-943515-2In progressConditioning C#2Wednesday, September 30, 2020, 06:14: Power
/ sources on.
Wednesday, September 30, 2020, 06:17:
 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx 
  784   Wednesday, February 12, 2020, 11:04 Aaron Schmidt LP-SIS  41790-943515-1In progressConditioning HSUsing a broken LP-FEBIAD oven for out gassing.
Tentative UC#31*
Wednesday, February 12, 2020, 10:57:
 UC#31.docx 
  816   Friday, October 16, 2020, 11:33 Aaron SchmidtTa#61LP-SISITETM444508-143515-1In progressConditioning Ta#61Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39:
TP1B on.
 Ta#61.docxITE-TM4-Ta#61-LP-SIS_Test_Stand.docxER-580-230-30kV-M133.txtER-580-230-30kV-M28.txt 
  793   Tuesday, May 19, 2020, 06:01 Aaron Schmidt     42972-8Problems/SolutionsLeak check / Troubleshoot https://elog.triumf.ca/TIS/Test-Stand/791
 May_19-20_Leak_check_-_FS#3.docxMess_inside_TS_-_1.jpgMess_inside_TS_-_2.jpgBlock_water_leak_visible.jpg 
  1002   Tuesday, April 09, 2024, 16:01 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online useTuesday, April 09, 2024, 15:25: Roughing.

Wednesday, April 10, 2024,
05:41: TP1B on. 
 EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx 
  1004   Wednesday, April 17, 2024, 14:16 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online use - Run 2https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08:
 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx 
  719   Friday, April 26, 2019, 13:45 Aaron SchmidtTa#58LP-SISITETM243044-442972-7In progressConditioning Ta#58 HSFriday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo
pumps on.
 7x 
  1026   Tuesday, October 29, 2024, 18:25 Aaron SchmidtUC#46 (assembly only)LP-IG-LISITWTM4 42972-6 / 39956-1In progressConditioning UC#46 Assembly 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20:
Roughing. 
  
  738   Wednesday, June 26, 2019, 11:34 Aaron SchmidtTest TaHP-SIS TM4No Target oven #42972-4In progressTest target for TM4 checksThe HP-SIS uses the older center block.
No serial number found. 
Loaded with Tantalum. Rough Target
  
  722   Tuesday, May 14, 2019, 10:22 Aaron SchmidtZrC#8LP-SISITETM243044-542972-3In progressConditioning ZrC#8 HSTuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on.
 ZrC#8.docxTS-2019-05-14-11-05.rgaTS-2019-05-16-07-30.rgaTS-2019-05-21-07-10.rgaITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx 
  1005   Friday, April 19, 2024, 11:33 Dave Neilson-LP-FEBIAD  44692-442972-10In progressDevelopment target test - Calibrated leak - Anode mode Friday, April 19, 2024, 11:32: 
 assembly installed in test stand. 
VV1 closed, pumping down
  
  1038   Thursday, December 05, 2024, 15:38 Dave Neilson LP-FEBIAD  44692-442972-10 FEBIAD developmentTuesday, December 02, 2024, 15:35 
  - Target loaded into the test stand
Thursday, December 03, 2024, 14:33
  
  1044   Tuesday, January 07, 2025, 17:06 Dave Neilson LP-FEBIAD  44692-442972-10In progressFEBIAD development Tuesday, January 07, 2025, 16:00
-  Target assembly installed in test
stand. electrical connections assessed:
  
  717   Monday, April 15, 2019, 14:42 Aaron Schmidt LP-SIS   42972-1DoneConditioning UC#27 HS & test FS#3New coil lines installed for P2N testing
later.
Monday, April 15, 2019, 14:15: Roughing.
 UC#27_&_FS#3_check.docxTS-2019-04-16-08-20.rga 
  999   Thursday, March 14, 2024, 17:43 Dave Neilson LP-FEBIAD  44692-4 42972 Calibrated Leak Development Thursday, March 14, 2024, 15:39:
Roughing
Thursday, March 14, 2024, 16:20:TP1B
  
  685   Monday, September 17, 2018, 11:52 Aaron SchmidtUC#25LP-SISITWTM2 42752-9In progressConditioning Heat Shield for UC#25Monday, September 17, 2018, 11:47: Roughing*.
Doors not sealing, help acq'd 
Monday, September 17, 2018, 11:51:
 OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlpTS-2018-09-17-14-10.rgaUC#25.docx 