Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 5 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  964   Monday, May 01, 2023, 14:31 Aaron SchmidtTiC#5LP-FEBIADITETM444692-545235-20In progressConditioning TiC#5New TiC LP-FEBIAD Target installed.
Monday, May 01, 2023, 14:23: Roughing.
Monday, May 01, 2023, 21:42: TP1B
 TiC#5_-_44692-5_Anode_&_Coil_checks.docxTiC#5_-_44692-5_Conditioning.docx 
  963   Wednesday, April 26, 2023, 08:46 Aaron SchmidtTiC#5LP-FEBIADITETM444692-645235-20 Testing TiC#5 assembly w/ an empty targetAnode remade with a ceramic "elbow-cube".
Empty target oven in use for testing.
Wednesday, April 26, 2023, 08:44:
 TiC#5_empty_container_run.docxScreenshot_from_2023-04-27_21-54-15.png 
  962   Monday, April 17, 2023, 14:08 Aaron SchmidtTiC#6HP-FEBIADITWTM244692-1045235-12In progressConditioning TiC#6Monday, April 17, 2023, 14:03: Roughing.
Monday, April 17, 2023, 14:08: BV1A
open.
  
  961   Thursday, April 13, 2023, 11:07 Aaron Schmidt      In progressInstallation of new IDP-15 TMS:TP2IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010
  
  960   Wednesday, March 29, 2023, 12:22 Aaron SchmidtTiC#5LP-FEBIADITETM444692-745235-20FailedConditioning TiC#5Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22:
TP1B on.
 TiC#5_conditioning.docx 
  959   Thursday, February 02, 2023, 12:44 Aaron Schmidt LP-SIS  44062-1-SK 45235-1In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41:
  
  958   Tuesday, January 31, 2023, 10:42 Aaron Schmidt LP-SIS  44062-1-SK45235-7In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39:
  
  957   Tuesday, January 17, 2023, 09:48 Aaron Schmidt      Problems/SolutionsTMS:RP2 FailureTuesday, January 17, 2023, 09:48: TMS:RP2
off. Audible failure was in progress. Also
observable on the strip tool. Vacuum group
  
  956   Monday, January 16, 2023, 16:02 Aaron Schmidt HP-FEBIAD-CTL    In progressHP-FEBIAD testsExtra wraps of foil around the center block
(6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40:
  
  955   Thursday, January 12, 2023, 09:04 Aaron Schmidt LP-SIS  44691-1444378-20In progress Test for Aurelia L. Empty LP-SIS w/ end
caps in. Right side expanded.
Thermocouples installed (R - L):
  
  954   Tuesday, January 03, 2023, 10:03 Carla Babcock       Recovery from power outageEasy recovery after power outage, just
had to power cycle the ground PLC IOC and
the BiRa IOC.
  
  953   Wednesday, December 21, 2022, 17:06 Carla Babcock       Prep for power outageSource and beamline power supplies turned
off in EPICS
HV cage power off
  
  952   Monday, December 19, 2022, 12:49 Carla Babcock HP-FEBIAD     HP-FEBIAD testsMonday, December 19, 2022, 12:06 : Tomislav
changed the polarity of the anode power supply
last week and everything has been closed
  
  951   Friday, December 16, 2022, 10:32 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 3Thermocouples installed (X):
O - O
O - Anode
  
  950   Tuesday, December 13, 2022, 16:12 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 2Thermocouples installed (X):
O - O
O - Anode
 Re-routed_Anode_FEBIAD_12-2022_Test_2.docx 
  949   Tuesday, December 06, 2022, 11:20 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD TestsThermocouples installed:
O - O
O - Anode
 Re-routed_Anode_FEBIAD_12-2022_Test_1.docxITS_FEBIAD_measurements_12-2022_Test_1.xlsx 
  948   Monday, December 05, 2022, 15:41 Aaron Schmidt       Source tray insulator replacement Monday, December 05, 2022, 15:38:
Source Tray TGHT & TBHT insulators replaced. 
Torqued @ 75 in-lbs. (Reference image
 7x 
  947   Wednesday, November 23, 2022, 13:52 Aaron Schmidt     44378-14In progressFEBIAD Coil TestsSam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51
  
  946   Wednesday, November 16, 2022, 13:28 Aaron Schmidt      Problems/SolutionsTSG:TP1A Replaced See elog 944
Wednesday, November 16, 2022, 13:23:
TP1 A replaced
  
  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating testHeated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature
  
ELOG V2.9.2-2455