ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
970
|
Thursday, June 08, 2023, 14:22 |
Aaron Schmidt | | | | | | | | Rough down empty chamber | Thursday, June 08, 2023, 14:22: Roughing. |
|
|
971
|
Thursday, July 06, 2023, 16:55 |
Aaron Schmidt | Nb#10 | LP-IG-LIS | ITW | TM2 | 45447-7 | 42132-2 | In progress | Conditioning Nb#10 | Thursday, July 06, 2023, 16:13: Roughing.
Thursday, July 06, 2023, 16:41: TP1B
on. |
|
|
972
|
Monday, July 10, 2023, 15:01 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Monday, July 10, 2023, 15:01: Roughing.
Wednesday, July 12, 2023,
09:38: Venting both chambers. |
|
|
973
|
Thursday, July 13, 2023, 07:37 |
Aaron Schmidt | | | | | | | | Tests - Aurelia L | Thursday, July 13, 2023, 07:37: Chamber
is vented. Beamline is vented. Interlock
bypassed on TPS:IV4 - AS |
|
|
975
|
Wednesday, August 09, 2023, 14:29 |
Aaron Schmidt | | LP-SIS | | | 45220-6 | 45235-3 | In progress | Graphite target test 1 (C2023A) | Graphite
experiment 2: ID Gr-230601, WO#45220-6 (
|
|
|
976
|
Monday, August 14, 2023, 12:11 |
Aaron Schmidt | | LP-SIS | | | 45220-11 | 45235-3 | | Graphite target test 2 (C2023B) | Graphite experiment insert 1: ID GR-230515,
WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded, |
|
|
977
|
Wednesday, August 16, 2023, 11:32 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Wednesday, August 16, 2023, 11:32: Roughing.
Thursday, August 17, 2023,
11:01: Venting. |
|
|
978
|
Friday, August 25, 2023, 17:21 |
Aaron Schmidt | Nb#11 | LP-IG-LIS | ITW | TM2 | 45447-9 | 42132-4 | In progress | Conditioning Nb#11 | Replacement for Nb#10
Friday, August 25, 2023, 17:15: Roughing.
Friday, August 25, 2023, 17:57: Vacuum |
|
|
979
|
Tuesday, August 29, 2023, 12:14 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17:
TP1B started. |
|
|
980
|
Monday, September 25, 2023, 16:31 |
Aaron Schmidt | Ta#66 | LP-SIS | ITW | TM2 | 45220-5 | 45235-9 | Done | Conditioning Ta#66 & HV Tests. | Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23: |
|
|
981
|
Thursday, September 28, 2023, 13:42 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Thursday, September 28, 2023, 13:40: Roughing
- BB.
Tuesday, October 10, 2023, |
|
|
982
|
Tuesday, October 10, 2023, 15:46 |
Aaron Schmidt | Ta#68 (Spare) | LP-SIS | | | 45220-3 | 45235-11 | In progress | Conditioning Ta#68 (Spare) | Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46:
TP1B on. |
|
|
983
|
Wednesday, October 18, 2023, 15:43 |
Aaron Schmidt | | LP-SIS | | | 45447-12 | 45235-17 | In progress | Conditioning UC#43 (empty) w/ gas line | Thermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line |
|
|
984
|
Monday, October 30, 2023, 16:01 |
Aaron Schmidt | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, October 30, 2023, 16:00
Roughing
Tuesday, October 31, 2023, |
|
|
985
|
Thursday, November 16, 2023, 09:43 |
Aaron Schmidt | | LP-SIS | | | | | In progress | Thermal tests | Aurelia has been testing on the ISAC TS
since last week. Thermocouples are installed
in the end cap, left side & the ionizer. |
|
|
987
|
Tuesday, December 12, 2023, 12:41 |
Aaron Schmidt | | | | | | | Done | Source Tray / TS inspection | Tuesday, December 12, 2023, 12:39: Visual
inspection.
Source tray: OK. Minor cracks on |
|
|
989
|
Thursday, January 18, 2024, 10:44 |
Aaron Schmidt | | | | | | | Done | Thermal tests 2 | December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer. |
|
|
990
|
Thursday, January 18, 2024, 10:47 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Solenoid Replaced. | Issues with valve operations due to a leak
in the solenoid valve above FC0. The HPA
leak did not allow for sufficient pressure |
|
|
991
|
Thursday, January 18, 2024, 10:49 |
Aaron Schmidt | | LP-SIS | | | 44139-2 | 45235-22 | In progress | Conditioning UCx HS | Straight/closed TGHT tube oven installed.
SIS Assembly.
Thursday, January 18, 2024, 10:32: |
|
|
992
|
Monday, January 22, 2024, 13:55 |
Aaron Schmidt | | LP-SIS | | | 45447-19 | 45235-22 | In progress | Conditioning UCx HS - 2 | Conditioning HS for UCx. LP-SIS oven /
end caps installed
Monday, January 22, 2024, 13:53: |
|
|