928
|
Wednesday, May 25, 2022, 15:48 |
Aaron Schmidt | SiC#42 | HP-FEBIAD | ITW | TM2 | 44692-9 | 44378-5 | In progress | Conditioning SiC#42 | Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B
on. |
|
|
876
|
Monday, June 07, 2021, 13:45 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Ta#62 Conditioning | Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B
on. (Tripped shortly after?) |
|
|
879
|
Wednesday, June 09, 2021, 14:31 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Install MB1 window & 9 pin for V test. | Installed a new window on MB1 as per Aurelia.
Connect modified 9 pin connector & voltage
meters for Ta#62 testing. |
|
|
880
|
Monday, June 21, 2021, 11:53 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | Failed | Ta#62 Conditioning - 2 | Replace 9-pin back to normal grounded setup.
Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing |
|
|
882
|
Friday, June 25, 2021, 11:18 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44691-4 | 44378-4 | Done | Ta#62 Conditioning - New | Replacement Ta target for the previous
one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing. |
|
|
874
|
Wednesday, May 26, 2021, 14:29 |
Aaron Schmidt | UC#33 (HS) | LP-SIS | ITW | TM2 | | 44378-3 | In progress | UC#33 HS conditioning | HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B |
|
|
939
|
Tuesday, August 30, 2022, 13:58 |
Aaron Schmidt | | | | | 44062-7 | 44378-25 | In progress | Conditioning UC#40 assembly | Conditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only). |
|
|
934
|
Thursday, June 23, 2022, 11:00 |
Aaron Schmidt | SiC#44 | HP-FEBIAD | ITE | TM4 | 37978-1 | 44378-24 | In progress | Conditioning SiC#44 | Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A
open. |
|
|
940
|
Tuesday, September 27, 2022, 07:55 |
Aaron Schmidt | C#4 | LP-SIS | ITE | TM4 | 44691-3 | 44378-23 | In progress | Conditioning C#4 w/ thermocouples | Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X |
|
|
903
|
Thursday, October 14, 2021, 10:13 |
Aaron Schmidt | | LP-SIS | ITW | TM2 | | 44378-22 | In progress | Conditioning UC#36 HS | Tube / TGHT only.
Thursday, October 14, 2021, 10:11:
Roughing. |
|
|
955
|
Thursday, January 12, 2023, 09:04 |
Aaron Schmidt | | LP-SIS | | | 44691-14 | 44378-20 | In progress | | Test for Aurelia L. Empty LP-SIS w/ end
caps in. Right side expanded.
Thermocouples installed (R - L): |
|
|
848
|
Wednesday, February 10, 2021, 09:49 |
Aaron Schmidt | | LP-SIS | | | 44691-8 | 44378-2 / 44378-3 | Failed | Energy spread calibration with SIS | Note* target has a ring on the TGHT - Right
leg. EE & PE placed. Target to HS OL
- OK. |
|
|
843
|
Monday, February 01, 2021, 08:38 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration | Monday, February 01, 2021, 08:38 : The
anode seems to be shorted but we can still
test the amount of dispersion at the |
|
|
840
|
Thursday, January 21, 2021, 10:10 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Done | Energy spread calibration - SIS with TBHT negatively biased | Thursday, January 21, 2021, 10:05:
Anodeless Negative Bias On Surface Ion
Source, or ANBOSIS (still working on the |
|
|
842
|
Friday, January 29, 2021, 09:13 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | In progress | TS settings ok. | Friday, January 29, 2021, 09:11: CANBUS
controller was replaced. Quick systems check
ok. Sources, HV, & Optics all good. |
|
|
845
|
Thursday, February 04, 2021, 19:22 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Done | Energy spread calibration with SIS | See e-log entry: 884:
Thursday, February 04, 2021, 18:45:
Roughing |
|
|
846
|
Monday, February 08, 2021, 09:20 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration with SIS. No PE | Re-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17:
Roughing. |
|
|
930
|
Tuesday, May 31, 2022, 13:35 |
Aaron Schmidt | UCx HS | | ITW | TM2 | | 44378-19 | In progress | Conditioning UC#38 assembly | Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B |
|
|
932
|
Saturday, June 18, 2022, 10:04 |
Aaron Schmidt | SiC#43 | HP-FEBIAD | ITW | TM2 | 42464-1 | 44378-16 | In progress | Conditioning SiC#43 | Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data |
|
|
947
|
Wednesday, November 23, 2022, 13:52 |
Aaron Schmidt | | | | | | 44378-14 | In progress | FEBIAD Coil Tests | Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 |
|
|