ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
510
|
Wednesday, June 01, 2016, 10:02 |
Aaron Schmidt | UC#16 | LP-IG-LIS | ITE | TM4 | 39814-V2-1 | | | Conditioning Heat shield for UC#16 | Wednesday, June 01, 2016, 10:02: Begin
roughing.
Wednesday, June 01, 2016, 10:44: |
|
|
537
|
Friday, September 02, 2016, 15:47 |
Aaron Schmidt | SiC#34 | LP-IG-LIS | ITE | TM4 | 39814-V2-1 | 41751-9 | | Conditioning SiC# 34 | Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18:
Turbos started -AM |
|
|
547
|
Tuesday, October 18, 2016, 13:29 |
Aaron Schmidt | Ta#50 | LP-SIS | ITE | TM4 | 41790-5 | 41751-1 | In progress | Conditioning Ta#50 | Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46:
Turbo pumps started. |
9x |
|
592
|
Friday, June 09, 2017, 13:28 |
Aaron Schmidt | Ta#52 | LP-SIS | ITE | TM4 | 42218-14 | 41751-8 | In progress | Conditioning Ta#52 | Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo
pumps on. |
8x |
|
607
|
Friday, October 06, 2017, 12:14 |
Aaron Schmidt | SiC#37 | HP-FEBIAD | ITE | TM4 | 39530-10 | 41751-4 | In progress | Conditioning SiC#37 | NOTE* : The right coil terminal terminates
into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12: |
9x |
|
610
|
Friday, October 13, 2017, 15:53 |
Aaron Schmidt | SiC#37 | HP-FEBIAD | ITE | TM4 | 39530-10 | 41751-4 | In progress | Conditioning SiC#37 (ii) | Previous short fixed. Grid clamp removed.
Grid tack welded.
Friday, October 13, 2017, 15:49: |
10x |
|
648
|
Tuesday, March 13, 2018, 06:00 |
Aaron Schmidt | UC#22 | LP-SIS | ITE | TM4 | | | In progress | Conditioning Heat Shield for UC#22 | Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo
Pumps started. |
|
|
671
|
Tuesday, July 03, 2018, 12:46 |
Aaron Schmidt | Ta#56 | HP-SIS | ITE | TM4 | 42218-9 | 42752-3 | In progress | Conditioning Ta#56 | Tuesday, July 03, 2018, 12:44: Roughing
Tuesday, July 03, 2018, 13:32: Turbo
pumps started. |
8x |
|
676
|
Friday, July 27, 2018, 14:44 |
Aaron Schmidt | UC#24 | LP-SIS | ITE | TM4 | 41177-3 | 42752-6 | In progress | Conditioning Heat Shield for UC#24 & voltage test prep | 4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing |
|
|
684
|
Wednesday, September 12, 2018, 11:19 |
Aaron Schmidt | Ta#57 | LP-SIS | ITE | TM4 | 41177-3 | 42752-6 | In progress | Conditioning Ta#57 | Wednesday, September 12, 2018, 11:06: Roughing.
Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52: |
9x |
|
686
|
Friday, September 21, 2018, 11:41 |
Aaron Schmidt | UC#26 | LP-IG-LIS | ITE | TM4 | | 42132-1 | In progress | Conditioning Heat Shield for UC#26 | Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41:
Doors sealed for roughing. |
|
|
724
|
Saturday, May 25, 2019, 12:43 |
Aaron Schmidt | Test FEBIAD / TM4 | LP-FEBIAD | | TM4 | 395530-3 | 42752-5 | In progress | Installed TM4 Source Tray | Silver bolts on TGHT & Coil Lines.
Oxide steel bolts on TBHT. Filed target to
suit / fit (Previously heated). Rubber O-rings |
|
|
725
|
Tuesday, May 28, 2019, 15:05 |
Aaron Schmidt | Test FEBIAD / TM4 | LP-FEBIAD | | TM4 | 395530-3 | 42752-5 | In progress | TM4 Source Tray - Episode II | SEE ELOG 724
Tuesday, May 28, 2019, 15:02: Roughing
Tuesday, May 28, 2019, 15:32: Turbos |
|
|
726
|
Monday, June 03, 2019, 11:35 |
Aaron Schmidt | | LP-SIS | | TM4 | 395530-3 | 42752-5 | Problems/Solutions | TGHT PS Failed. | Monday, June 03, 2019, 10:36: BIAS Near
55 kV, brought back down to 50 kV. Multiple
sparks. Optics tripped, wire scanners & |
|
|
727
|
Monday, June 03, 2019, 14:13 |
Aaron Schmidt | | | | TM4 | 395530-3 | 42752-5 | Done | TMS:TP6 Turbo pump issue. (Ok now) | Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud
hum / buzz sound. The vacuum pressure is |
|
|
738
|
Wednesday, June 26, 2019, 11:34 |
Aaron Schmidt | Test Ta | HP-SIS | | TM4 | No Target oven # | 42972-4 | In progress | Test target for TM4 checks | The HP-SIS uses the older center block.
No serial number found.
Loaded with Tantalum. Rough Target |
|
|
802
|
Wednesday, July 22, 2020, 08:56 |
Luca Egoriti | P2N test | HP-SIS | ITE | TM4 | | | In progress | p2n heating test - electrical feedthrough configuration | The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target. |
|
|
816
|
Friday, October 16, 2020, 11:33 |
Aaron Schmidt | Ta#61 | LP-SIS | ITE | TM4 | 44508-1 | 43515-1 | In progress | Conditioning Ta#61 | Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39:
TP1B on. |
|
|
872
|
Wednesday, April 28, 2021, 22:34 |
Luca Egoriti | P2N test - Apr 2021 | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A |
|
|
876
|
Monday, June 07, 2021, 13:45 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Ta#62 Conditioning | Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B
on. (Tripped shortly after?) |
|
|