  510   Wednesday, June 01, 2016, 10:02 Aaron SchmidtUC#16LP-IG-LISITETM439814-V2-1  Conditioning Heat shield for UC#16Wednesday, June 01, 2016, 10:02: Begin
roughing.
Wednesday, June 01, 2016, 10:44:
 OMEGA_OM-DAQPRO-5300_03-Jun-16_08.14.47.dlpTS-2016-06-02_UC#16.rgaTS-2016-06-02-13-46_UC#16.rgaUC#16.docx 
  537   Friday, September 02, 2016, 15:47 Aaron SchmidtSiC#34LP-IG-LISITETM439814-V2-141751-9 Conditioning SiC# 34Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18:
Turbos started -AM
 ER-580-270-m40.txtITE-TM4-SiC#34-LP-IG-LIS_Test_Stand.docxSiC#34.docxTS-2016-09-06-08-12.rga 
  547   Tuesday, October 18, 2016, 13:29 Aaron SchmidtTa#50LP-SISITETM441790-541751-1In progressConditioning Ta#50Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46:
Turbo pumps started.
 9x 
  592   Friday, June 09, 2017, 13:28 Aaron SchmidtTa#52LP-SISITETM442218-1441751-8In progressConditioning Ta#52Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo
pumps on.
 8x 
  607   Friday, October 06, 2017, 12:14 Aaron SchmidtSiC#37HP-FEBIADITETM439530-1041751-4In progressConditioning SiC#37NOTE* : The right coil terminal terminates
into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12:
 9x 
  610   Friday, October 13, 2017, 15:53 Aaron SchmidtSiC#37HP-FEBIADITETM439530-1041751-4In progressConditioning SiC#37 (ii)Previous short fixed. Grid clamp removed.
Grid tack welded.
Friday, October 13, 2017, 15:49:
 10x 
  648   Tuesday, March 13, 2018, 06:00 Aaron SchmidtUC#22LP-SISITETM4  In progressConditioning Heat Shield for UC#22Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo
Pumps started.
  
  671   Tuesday, July 03, 2018, 12:46 Aaron SchmidtTa#56HP-SISITETM442218-942752-3In progressConditioning Ta#56Tuesday, July 03, 2018, 12:44: Roughing
Tuesday, July 03, 2018, 13:32: Turbo
pumps started.
 8x 
  676   Friday, July 27, 2018, 14:44 Aaron SchmidtUC#24LP-SISITETM441177-342752-6In progressConditioning Heat Shield for UC#24 & voltage test prep4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
  
  684   Wednesday, September 12, 2018, 11:19 Aaron SchmidtTa#57LP-SISITETM441177-342752-6In progressConditioning Ta#57Wednesday, September 12, 2018, 11:06: Roughing.
Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52:
 9x 
  686   Friday, September 21, 2018, 11:41 Aaron SchmidtUC#26LP-IG-LISITETM4 42132-1In progressConditioning Heat Shield for UC#26Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41:
Doors sealed for roughing.
 TS-2018-09-21-14-53.rgaUC#26.docx 
  724   Saturday, May 25, 2019, 12:43 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressInstalled TM4 Source TraySilver bolts on TGHT & Coil Lines.
Oxide steel bolts on TBHT. Filed target to
suit / fit (Previously heated). Rubber O-rings
 TM4_Source_Tray_-_2019_-_Leak_Check.docxTM4_Source_Tray_-_2019.docxTS-2019-05-27-07-08.rga 
  725   Tuesday, May 28, 2019, 15:05 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressTM4 Source Tray - Episode IISEE ELOG 724
Tuesday, May 28, 2019, 15:02: Roughing
Tuesday, May 28, 2019, 15:32: Turbos
 TM4_Source_Tray_-_2019_-_2.docxTS-2019-05-29-07-08.rgaTM4_Source_Tray_-_2019_-_3_-_HV_-_1.docxTM4_Source_Tray_-_2019_-_4_-_HV_-_2_-_Heat_on.docxTM4_Source_Tray_-_2019_-_5_-_HV_over_50_-Heat_on.docx 
  726   Monday, June 03, 2019, 11:35 Aaron Schmidt LP-SIS TM4395530-342752-5Problems/SolutionsTGHT PS Failed.Monday, June 03, 2019, 10:36: BIAS Near
55 kV, brought back down to  50 kV. Multiple
sparks. Optics tripped, wire scanners &
  
  727   Monday, June 03, 2019, 14:13 Aaron Schmidt   TM4395530-342752-5DoneTMS:TP6 Turbo pump issue. (Ok now)Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud
hum / buzz sound. The vacuum pressure is
  
  738   Wednesday, June 26, 2019, 11:34 Aaron SchmidtTest TaHP-SIS TM4No Target oven #42972-4In progressTest target for TM4 checksThe HP-SIS uses the older center block.
No serial number found. 
Loaded with Tantalum. Rough Target
  
  802   Wednesday, July 22, 2020, 08:56 Luca Egoriti P2N testHP-SISITETM4  In progressp2n heating test - electrical feedthrough configuration The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target.
 ISACteststand_TMwiring.pptxP2N-TestStand_20200722.pngP2N-TestStand_1200A.png 
  816   Friday, October 16, 2020, 11:33 Aaron SchmidtTa#61LP-SISITETM444508-143515-1In progressConditioning Ta#61Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39:
TP1B on.
 Ta#61.docxITE-TM4-Ta#61-LP-SIS_Test_Stand.docxER-580-230-30kV-M133.txtER-580-230-30kV-M28.txt 
  872   Wednesday, April 28, 2021, 22:34 Luca EgoritiP2N test - Apr 2021P2N-SISITETM4  In progressP2N heating test Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A
 Target_580A_100A_glowing.jpgInitial_rampup.PNG 
  876   Monday, June 07, 2021, 13:45 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressTa#62 ConditioningMonday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B
on. (Tripped shortly after?)
 Ta#62_Conditioning_-_1.docx 