  792   Tuesday, April 07, 2020, 10:53 Anders Mjos       Vacuum loss / spike / Shutdown


   
        
            
  
  871   Monday, April 19, 2021, 14:58 Anders Mjos P2N-SIS    Problems/SolutionsWater leak on coil neg (H and F)Determined on Friday April 16th that the
water leak was on the coil negative circuit.
This was determined by circulating water
  
  828   Friday, December 04, 2020, 13:39 Alexander Shkuratoff      DoneTM3 service tray prototype preparatory HV testsFriday, December 04, 2020, 13:34
Vacuum is at 3.6e-6 Torr and possibly
still dropping. Starting HV tests with just
  
  831   Monday, December 14, 2020, 11:50 Alexander Shkuratoff      In progressTM3 service tray prototype HV testsMonday, December 14, 2020, 11:30
Switched off all breakers in HV cage.
Started HV testing of TM3 prototype.
  
  832   Tuesday, December 15, 2020, 11:24 Alexander Shkuratoff       TM3 service tray prototype HV testsTuesday, December 15, 2020, 11:15
Vacuum at 1.0e-6 Torr. Turned bias
power supply on, starting HV ramp at 500
  
  898   Tuesday, September 07, 2021, 16:04 Alexander Shkuratoff      DoneReplaced flange on F/T R with blank flangeFeedthrough R had a flange installed with
a HV feedthrough on it for TM3 service tray
prototype HV tests. It was replaced today
  
  895   Monday, August 23, 2021, 10:49 Aaron Schmidt - Fernando Maldonado      Problems/SolutionsRGA replaced with a blind flangeMonday, August 23, 2021, 10:49: Aaron
removed the Extorr RGA and install a blind
instead.
  
  500   Tuesday, March 29, 2016, 14:44 Aaron Schmidt       Pumping down empty chamber.Tuesday, March 29, 2016, 14:43: Roughing.

 Wednesday, March 30,
2016, 14:33: Venting   -AM
  
  501   Wednesday, March 30, 2016, 16:32 Aaron SchmidtTa#47LP-SISITETM441790-141120-05In progressConditioning Ta#47Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34
: Turbos started -AM
 TS-2016-03-30_Ta#47.rgaER-580-230-30kV-m23.txtER-580-230-30kV-m27.txtITE-TM4-Ta#47-LP-SIS_Test_Stand.docxTa#47.docx 
  502   Monday, April 04, 2016, 11:33 Aaron Schmidt LP-SIS  41790-239956-8In progressTesting restraint insulator prototypeMonday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started
 Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx 
  503   Wednesday, April 13, 2016, 13:03 Aaron Schmidt LP-SIS  41790-239956-8 Testing restraint insulator prototype (2)Wednesday, April 13, 2016, 13:03: Begin
roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34:
 Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx 
  506   Thursday, April 21, 2016, 14:26 Aaron SchmidtTa#48HP-SISITWTM241369-541120-5In progressConditioning Ta#48Thursday, April 21, 2016, 14:25: Begin
pumping down.
Thursday, April 21, 2016, 15:02:
 TS-2016-04-21_Ta#48.rga 
  507   Monday, May 02, 2016, 16:03 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator TestMonday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos
started -AM
 TS-2016-05-02_EE_insulator_test.rga 
  508   Friday, May 06, 2016, 10:18 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test (2) No PEFriday, May 06, 2016, 10:18: Begin roughing
Venting: VCR on HS not closed
Friday, May 06, 2016, 12:58: Roughing
  
  509   Thursday, May 12, 2016, 13:32 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test, No PE , Dirty EE.Thursday, May 12, 2016, 13:00: Begin Roughing.
Thursday, May 12, 2016, 13:40: Turbo
Pumps started
  
  510   Wednesday, June 01, 2016, 10:02 Aaron SchmidtUC#16LP-IG-LISITETM439814-V2-1  Conditioning Heat shield for UC#16Wednesday, June 01, 2016, 10:02: Begin
roughing.
Wednesday, June 01, 2016, 10:44:
 OMEGA_OM-DAQPRO-5300_03-Jun-16_08.14.47.dlpTS-2016-06-02_UC#16.rgaTS-2016-06-02-13-46_UC#16.rgaUC#16.docx 
  511   Friday, June 03, 2016, 14:50 Aaron Schmidt       Pumping down empty chamber.Friday, June 03, 2016, 14:50: Turbo pumps
started.
Friday, June 03, 2016, 15:22: 
  
  512   Thursday, June 09, 2016, 14:56 Aaron Schmidt LP-SIS     TUBE ONLYThursday, June 09, 2016, 14:50: Begin roughing.
Thursday, June 09, 2016, 15:34: Turbo
pumps started.
 Tube_only_SIS_test.zip 
  514   Tuesday, June 14, 2016, 10:46 Aaron Schmidt LP-SIS     TUBE ONLY - NO PLASMA ELECTRODETuesday, June 14, 2016, 10:46: Begin roughing.
Tuesday, June 14, 2016, 11:16: Turbo
pumps started.
 Tube_only_SIS_test-all-160615.zip2016-06-13.zip2016-06-15.zipre-em-plots.zip 
  515   Thursday, June 16, 2016, 14:34 Aaron Schmidt LP-SIS     TUBE ONLY (3)Thursday, June 16, 2016, 14:33: Roughing.
Plasma Electrode re-attached. Salts replaced.
Thursday, June 16, 2016, 15:12: Turbo
 Tube_only-full-fernando_test-160617-PE-RPE.zipTube_only-full-fernando_test-160617-WPE.zip 