  1023   Thursday, October 03, 2024, 16:26 Aaron SchmidtTa#68HP-SISITETM245447-2645235-16 * Conditioning Ta#68HS note:
Base# 45235-16
Lid# 39956-8
  
  1002   Tuesday, April 09, 2024, 16:01 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online useTuesday, April 09, 2024, 15:25: Roughing.

Wednesday, April 10, 2024,
05:41: TP1B on. 
 EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx 
  1004   Wednesday, April 17, 2024, 14:16 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online use - Run 2https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08:
 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx 
  1016   Wednesday, July 31, 2024, 18:50 Aaron SchmidtTiC SpareHP-FEBIADITWTM445447-242752-7In progressConditioning Spare for TiC#7Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24:
TP1B on.
  
  992   Monday, January 22, 2024, 13:55 Aaron Schmidt LP-SIS  45447-1945235-22In progressConditioning UCx HS - 2Conditioning HS for UCx. LP-SIS oven /
end caps installed
Monday, January 22, 2024, 13:53:
  
  1022   Friday, September 20, 2024, 14:22 Aaron SchmidtTa#LP-SISITETM245447-1845235-13 Conditioning Ta# https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04:
  
  1018   Friday, August 09, 2024, 21:08 Ferran Boix PamiesTa#67 Thin foils LP-SISITETM445447-14 45235-10In progressTa#67 thin foil retestingFriday, August 09, 2024, 21:07 Insulators,
retainer and Re foil have been replaced,
source cup machined so the ion source does
 ITE-TM4-Ta#67-LP-SIS_Thin_Foil.docx 
  1014   Thursday, July 25, 2024, 14:26 Dave NeilsonTa#67 Thin foil LP-SISITETM345447-1445235-10 Conditioning Ta#67 Thin foilThursday, July 25, 2024, 14:25  -
competing electrical checks prior to test
stand installation
  
  1015   Monday, July 29, 2024, 23:02 Aurelia LaxdalTa#67 Thin foilsLP-SISITETM345447-1445235-10 Cooldown for removing the V wires  22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. 
  
  983   Wednesday, October 18, 2023, 15:43 Aaron Schmidt LP-SIS  45447-1245235-17In progressConditioning UC#43 (empty) w/ gas lineThermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line
 UC#43_Conditioning_empty_with_Gas_mod.docxUC#43_HS_with_gas_line_mod_-_Test_2.docxUC#43_HS_with_gas_line_mod_-_HV_Test.docx 
  923   Thursday, May 05, 2022, 14:43 Aaron Schmidt P2N-SIS  45241-145240-1In progressP2N assembly conditioning.Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper
  
  925   Tuesday, May 10, 2022, 10:09 Aaron Schmidt P2N-SISITETM445241-145240-1In progressP2N assembly conditioning - 2 Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed
  
  942   Tuesday, October 18, 2022, 13:25 Aaron SchmidtC#5LP-SIS  45235-544691-13In progressConditioning C#5Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28:
BV1A open
 C#5_-_Conditioning_start_-_HV.docx 
  944   Tuesday, November 15, 2022, 11:24 Aaron SchmidtUC#41 assemblyLP-SISITETM445220-845235-4In progressConditioning UC#41 assembly LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00:
 UC#41_assembly_conditioning.docx 
  967   Tuesday, May 16, 2023, 14:00 Aaron SchmidtTa#65LP-SISITETM445220-745235-2In progressConditioning Ta#65Calibrated window installed on the beam
line.
Tuesday, May 16, 2023, 13:45: Roughing
 Ta#65_conditioning_-_Mass_&_wire_scans.docx 
  975   Wednesday, August 09, 2023, 14:29 Aaron Schmidt LP-SIS  45220-645235-3In progressGraphite target test 1 (C2023A)Graphite
experiment 2: ID Gr-230601, WO#45220-6 (
 Graphite_target_45220-6.docxGraphitetesting_Aug102023.xlsx 
  980   Monday, September 25, 2023, 16:31 Aaron SchmidtTa#66LP-SISITWTM245220-545235-9DoneConditioning Ta#66 & HV Tests.Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23:
 Ta#66_HV_Test_1.docxTa#66_HV_test_2.docxTa#66_Conditioning.docx 
  982   Tuesday, October 10, 2023, 15:46 Aaron SchmidtTa#68 (Spare)LP-SIS  45220-345235-11In progressConditioning Ta#68 (Spare)Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46:
TP1B on.
 Ta#68-Spare_Conditioning.docx 
  984   Monday, October 30, 2023, 16:01 Aaron Schmidt LP-SIS  45220-245235-13In progressHV power surge test plus mass scans Monday, October 30, 2023, 16:00 
Roughing

Tuesday, October 31, 2023,
  
  986   Monday, November 27, 2023, 16:09 Ferran Boix Pamies LP-SIS  45220-245235-13In progressHV power surge test plus mass scansMonday, November 27, 2023, 16:09 
Roughing
Monday, November 27, 2023, 17:22
  